NTPC 및 주 전력공사 회처리 프로젝트 실적

Macawber Beekay가 NTPC와 인도 주 전력공사를 위해 준공했거나 수행 중인 회처리 프로젝트를 소개합니다.

일러스트: 발전소 옆의 회 사일로와 배관을 실은 파이프 랙

비산재 처리, 바닥재 처리 및 회 슬러리 처리 시스템을 포함하며, 프로젝트 구성, 시스템 용량, 준공 일자 또는 수행 현황을 함께 제공합니다.

  • 67projects listed
  • 55commissioned
  • 12under execution
  • 24utilities and owners
  • 800 MWlargest unit size
  • 1999earliest commissioning listed

Register Project references

Each row is one project. Filter by owner, status, scope or unit size, or search for a plant, utility, state or EPC contractor. Select a row to see the fly ash, bottom ash and slurry disposal specifications.

  1. In progressLara STPP, Stage IINTPC2 × 800 MWChhattisgarhFly ashBottom ashSlurryHCSD

    Fly ash system

    System
    Dense phase pressure conveying to the fly ash classification system (Stage I), then to the fine and main fly ash silos (Stage II)
    Capacity
    Stage I: 319 TPH per unit (6 + 2 lines)Stage II: coarse ash 105 TPH per stream (3 working, 2 standby per unit); fine ash 152.5 TPH (1 working, 1 standby, both units)
    Conveying distance
    Stage I: 315 mStage II: 1,128 m

    Bottom ash system

    System
    Water-impounded bottom ash hopper, jet pumps and slurry pumps to dewatering bins
    Capacity
    3 × 93 TPH

    Slurry disposal and HCSD

    System
    Lean slurry disposal, bottom ash
    Capacity
    3 streams, 1,115 m³/h per unit (1 working, 2 standby)
    Pumping distance
    1,334 m
    System
    High concentration slurry disposal (HCSD), fly ash
    Capacity
    6 × 133 TPH for both units (4 working, 2 standby)
    Pumping distance
    6,500 m, 25.6 m static head
    Owner
    NTPC Limited
    Executed through
    BHEL-ISG, Bengaluru
    Current status
    Supplies 41%Erection 17%
  2. In progressUkai Supercritical TPPGSECL1 × 800 MW (Unit 7)GujaratFly ashBottom ashSlurryHCSD

    Fly ash system

    System
    Single-stage dense phase pneumatic pressure conveying, ESP hoppers to main and intermediate silos
    Capacity
    326 TPH
    Conveying distance
    436 m

    Bottom ash system

    System
    Water-impounded bottom ash hopper, jet pumps and slurry pumps
    Capacity
    3 × 82 TPH

    Slurry disposal and HCSD

    System
    Lean slurry disposal, bottom ash (to ash dyke, or dewatering bins for truck disposal)
    Pumping distance
    3,000 m
    System
    High concentration slurry disposal (HCSD), fly ash
    Capacity
    2 × 142 TPH
    Pumping distance
    3,000 m
    Owner
    Gujarat State Electricity Corporation Ltd.
    Executed through
    Dineshchandra R. Agrawal Infracon, Gurugram
    Current status
    Under engineering
  3. In progressSingareni Thermal Power Project ExtensionSCCL1 × 800 MWTelanganaFly ashBottom ashSlurryHCSD

    Fly ash system

    System
    Dense phase pressure conveying to the intermediate and HCSD silos (Stage I), then to the main fly ash silos (Stage II)
    Capacity
    Stage I: 319 TPH per unit (6 + 2 lines)Stage II: 6 streams of 107 TPH per unit (3 working, 3 standby)
    Conveying distance
    Stage I: 710 mStage II: 1,550 m

    Bottom ash system

    System
    Water-impounded bottom ash hopper, jet pumps and slurry pumps to dewatering bins or ash dyke
    Capacity
    3 × 93 TPH

    Slurry disposal and HCSD

    System
    Lean slurry disposal, bottom ash
    Capacity
    3 streams, 1,185 m³/h per unit (1 working, 2 standby)
    Pumping distance
    4,000 m, 10 m static head
    System
    High concentration slurry disposal (HCSD), fly ash
    Capacity
    4 × 140 TPH (2 working, 2 standby)
    Pumping distance
    4,500 m, 30 m static head
    Owner
    The Singareni Collieries Company Ltd.
    Executed through
    Power Mech Projects, Hyderabad
    Current status
    Under engineering
  4. In progressDeen Bandhu Chhotu Ram TPP, Yamuna NagarHPGCL1 × 800 MWHaryanaFly ashBottom ashSlurry

    Fly ash system

    System
    Vacuum extraction with pressure conveying
    Capacity
    Vacuum: 6 × 57.5 TPHPressure: 3 × 115 TPH
    Conveying distance
    415 m

    Bottom ash system

    System
    Water-impounded bottom ash hopper, jet pumps and slurry pumps
    Capacity
    3 × 94 TPH

    Slurry disposal and HCSD

    System
    Lean slurry disposal, bottom ash and fly ash
    Capacity
    1,050 m³/h
    Pumping distance
    8,000 m, 15 m static head
    Owner
    Haryana Power Generation Corporation Ltd.
    Executed through
    BHEL (PSNR), Noida
    Current status
    Under design and engineeringCivil works 5%
  5. In progressUdangudi Super Thermal Power Plant, Stage ITANGEDCO2 × 660 MWTamil NaduFly ashBottom ash

    Fly ash system

    System
    Vacuum extraction (Stage I), then dense phase pressure conveying (Stage II)
    Capacity
    Stage I: 95 TPH per unitStage II: 2 × 75 TPH
    Conveying distance
    Stage I: 500 mStage II: 1,250 m

    Bottom ash system

    System
    Submerged scraper chain conveyor with jet pumps
    Capacity
    2 × 20 TPH
    Owner
    Tamil Nadu Generation and Distribution Corporation Ltd.
    Executed through
    BHEL-ISG, Bengaluru
    Current status
    Supplies 99.5%Erection 80%
  6. In progressBuxar Thermal Power ProjectSJVN2 × 660 MWBiharFly ashBottom ash

    Fly ash system

    System
    Vacuum extraction (Stage I), then dense phase pressure conveying (Stage II)
    Capacity
    Stage I: 6 × 60 TPH per unitStage II: 3 × 120 TPH
    Conveying distance
    Stage I: 100 mStage II: 1,750 m

    Bottom ash system

    System
    Water-impounded bottom ash hopper and jet pumps
    Capacity
    3 × 73.66 TPH per unit
    Owner
    SJVN Thermal Pvt. Ltd.
    Executed through
    Larsen & Toubro, Vadodara
    Current status
    Supplies completeErection: Unit 1 and common systems complete, Unit 2 30%
  7. In progressSagardighi Thermal Power StationWBPDCL1 × 660 MWWest BengalFly ashBottom ashSlurry

    Fly ash system

    System
    Vacuum extraction (Stage I), then dense phase pressure conveying (Stage II)
    Capacity
    Stage I: 8 × 56 TPH per unitStage II: 5 × 112 TPH
    Conveying distance
    Stage I: 117 mStage II: 740 m

    Bottom ash system

    System
    Water-impounded bottom ash hopper, jet pumps and slurry pumps
    Capacity
    3 × 98 TPH

    Slurry disposal and HCSD

    System
    Lean slurry disposal
    Capacity
    1,270 m³/h at 29 MWC
    Pumping distance
    3,750 m
    Owner
    West Bengal Power Development Corporation Ltd.
    Executed through
    BHEL-ISG, Bengaluru
    Current status
    Supplies 100%Erection 98%
  8. In progressTalcher TPP, Stage III (bottom ash and slurry package)NTPC2 × 660 MWOdishaBottom ash

    Bottom ash system

    System
    Water-impounded bottom ash hopper, jet pumps and slurry pumps
    Capacity
    3 × 90 TPH
    Owner
    NTPC Limited
    Executed through
    BHEL-ISG, Bengaluru
    Current status
    Supplies 87%Under erection
    Note
    Ordered by BHEL for NTPC's plant
  9. In progressKoradi TPPMAHAGENCO2 × 660 MW (Units 11 & 12)MaharashtraFly ashBottom ashSlurryHCSD

    Fly ash system

    System
    Single-stage dense phase pneumatic pressure conveying
    Capacity
    201.6 TPH
    Conveying distance
    950 m

    Bottom ash system

    System
    Water-impounded bottom ash hopper, jet pumps and slurry pumps
    Capacity
    3 × 96 TPH

    Slurry disposal and HCSD

    System
    Lean slurry disposal, bottom ash
    Capacity
    3 streams, 1,130 m³/h per unit (2 working, 1 standby)
    Pumping distance
    3,500 m
    System
    Coarse ash slurry pumps
    Capacity
    884 m³/h (1 working, 1 standby)
    Pumping distance
    260 m
    System
    Fly ash slurry pumps
    Capacity
    850 m³/h (1 working, 1 standby)
    Pumping distance
    122 m
    System
    High concentration slurry disposal (HCSD)
    Capacity
    236 m³/h at 60%, 210 m³/h at 65%, 188 m³/h at 70% concentration
    Pumping distance
    3,500 m
    Owner
    Maharashtra State Power Generation Company Ltd.
    Executed through
    TKIL Industries, Pune
    Current status
    Under design and engineeringCivil works 5%
  10. In progressKorba WestCSPGCL2 × 660 MWChhattisgarhFly ashBottom ashSlurryHCSD

    Fly ash system

    System
    Vacuum extraction with pressure conveying
    Capacity
    Vacuum: 6 × 42 TPHPressure: 3 × 84 TPH
    Conveying distance
    925 m

    Bottom ash system

    System
    Water-impounded bottom ash hopper, jet pumps and slurry pumps
    Capacity
    3 × 84 TPH

    Slurry disposal and HCSD

    System
    Lean slurry disposal, bottom ash (to ash dyke, or dewatering bins for truck disposal)
    Pumping distance
    13,000 m
    System
    High concentration slurry disposal (HCSD), fly ash
    Capacity
    6 × 115 TPH
    Pumping distance
    13,000 m
    Owner
    Chhattisgarh State Power Generation Company Ltd.
    Executed through
    BHEL (PSNR), Noida
    Current status
    Under design and engineering
  11. In progressTalcher STPS, Stage II (ash slurry disposal to mine)NTPC4 × 500 MWOdishaSlurryMine void filling

    Mine void filling

    System
    Ash slurry disposal to mine voids, with ash water recovery (AWRS)
    Capacity
    1,270 m³/h
    Pumping distance
    1,100 m
    Owner
    NTPC Limited
    Current status
    Supplies 80%Under erection
  12. In progressRihand Super Thermal Power Project, Stage INTPC2 × 500 MWUttar PradeshFly ash

    Fly ash system

    System
    Vacuum extraction (Stage I), then dense phase pressure conveying (Stage II)
    Capacity
    Stage I: 4 × 60 TPH per unitStage II: 2 × 120 TPH
    Conveying distance
    Stage I: 40 mStage II: 900 m
    Owner
    NTPC Limited
    Current status
    Supplies 100%Erection 60%Civil works 72%
  13. 2025North Karanpura TPSNTPC3 × 660 MWJharkhandFly ashBottom ashSlurryHCSD

    Fly ash system

    System
    Vacuum extraction (Stage I), then dense phase pressure conveying (Stage II)
    Capacity
    Stage I: 6 × 55.8 TPH per unitStage II: 3 × 111.6 TPH
    Conveying distance
    Stage I: 80 mStage II: 900 m

    Bottom ash system

    System
    Water-impounded bottom ash hopper, jet pumps and slurry pumps; bottom ash overflow (BAOF) slurry pumped to the dewatering bins or ash dyke
    Capacity
    3 × 96 TPH

    Slurry disposal and HCSD

    System
    Lean slurry disposal
    Capacity
    1,039 m³/h at 45 MWC
    Pumping distance
    3,000 m
    System
    High concentration slurry disposal (HCSD)
    Capacity
    163 m³/h
    Pumping distance
    5,000 m
    Owner
    NTPC Limited
    Executed through
    BHEL-ISG, Bengaluru
    Commissioning
    Unit 1: Feb 2023Unit 2: Feb 2024Unit 3: Jun 2025
  14. 2025Bhusawal TPSMAHAGENCO1 × 660 MW (Unit 6)MaharashtraFly ashBottom ashSlurryHCSD

    Fly ash system

    System
    Two-stage dense phase pneumatic pressure conveying
    Capacity
    Stage I: 297 TPHStage II: 2 × 148 TPH
    Conveying distance
    Stage I: 250 mStage II: 650 m

    Bottom ash system

    System
    Water-impounded bottom ash hopper, jet pumps and slurry pumps
    Capacity
    3 × 90 TPH

    Slurry disposal and HCSD

    System
    Lean slurry disposal, bottom ash
    Capacity
    2 streams of 1,250 m³/h (1 working, 1 standby)
    System
    High concentration slurry disposal (HCSD), fly ash
    Capacity
    2 × 193 TPH (1 working, 1 standby)
    Pumping distance
    12,000 m, 72.5 m static head
    Owner
    Maharashtra State Power Generation Company Ltd.
    Executed through
    BHEL-ISG, Bengaluru
    Commissioning
    Jan 2025
  15. 2024Wanakbori TPSGSECL1 × 800 MWGujaratFly ashBottom ashSlurryHCSD

    Fly ash system

    System
    Vacuum extraction (Stage I), then dense phase pressure conveying (Stage II)
    Capacity
    Stage I: 6 × 60 TPHStage II: 4 streams of 116 TPH per unit (3 working, 1 standby)
    Conveying distance
    Stage I: 70 mStage II: about 1,000 m

    Bottom ash system

    System
    Water-impounded bottom ash hopper, jet pumps and slurry pumps
    Capacity
    3 × 75 TPH

    Slurry disposal and HCSD

    System
    Lean slurry disposal, bottom ash
    Capacity
    2 streams of 890 m³/h (1 working, 1 standby)
    Pumping distance
    3,000 m, 15 m static head
    System
    High concentration slurry disposal (HCSD), fly ash
    Capacity
    2 × 200 TPH (1 working, 1 standby)
    Pumping distance
    1,300 m, 15 m static head
    Owner
    Gujarat State Electricity Corporation Ltd.
    Executed through
    BHEL-ISG, Bengaluru
    Commissioning
    Unit 1: Mar 2023Unit 2: Feb 2024
  16. 2024Telangana Super Thermal Power Project, KarimnagarNTPC2 × 800 MWTelanganaFly ashBottom ashSlurryHCSD

    Fly ash system

    System
    Two-stage dense phase pneumatic pressure conveying
    Capacity
    Stage I: 363 TPHStage II: 6 streams of 112.43 TPH per unit (3 working, 3 standby)
    Conveying distance
    Stage I: 130 mStage II: 1,150 m

    Bottom ash system

    System
    Water-impounded bottom ash hopper, jet pumps and slurry pumps
    Capacity
    3 × 109 TPH

    Slurry disposal and HCSD

    System
    Lean slurry disposal, bottom ash
    Capacity
    3 streams, 1,510 m³/h for both units (1 working, 2 standby)
    Pumping distance
    7,500 m, 30 m static head
    System
    High concentration slurry disposal (HCSD), fly ash
    Capacity
    6 × 129 TPH for both units (4 working, 2 standby)
    Pumping distance
    11,000 m, 30 m static head
    Owner
    NTPC Limited
    Executed through
    BHEL-ISG, Bengaluru
    Commissioning
    Unit 1: Mar 2023Unit 2: Feb 2024
  17. 2023Maitree Super Thermal Power Project, RampalBIFPCL2 × 660 MWBangladeshFly ashBottom ashSlurry

    Fly ash system

    System
    Pressure conveying in three stages, including ship loading from the main silos
    Capacity
    Stage I: 95 TPH per unitStage II: 2 × 75 TPH per unit (1 working, 1 standby)Stage III: 300 TPH common to both units, ship loading
    Conveying distance
    Stage I: up to 500 mStage II: 1,250 mStage III: 200 m

    Bottom ash system

    System
    Pressure conveying from the bottom ash main silo to ship loading
    Capacity
    2 × 300 TPH common to both units (1 working, 1 standby), 150 m

    Slurry disposal and HCSD

    System
    Ash slurry disposal, bottom ash and fly ash
    Capacity
    3 × 60 TPH dry ash basis, common to both units (2 working, 1 standby)
    Pumping distance
    2,500 m
    Owner
    Bangladesh-India Friendship Power Company (Pvt.) Ltd.
    Executed through
    BHEL-ISG, Bengaluru
    Commissioning
    Unit 1: Oct 2022Unit 2: Dec 2023
  18. 2023Rihand Super Thermal Power Project, Stage IIINTPC2 × 500 MWUttar PradeshFly ash

    Fly ash system

    System
    Dense phase pressure conveying (Stage II)
    Capacity
    3 × 102 TPH per unit (2 working, 1 standby)
    Conveying distance
    1,110 m
    Owner
    NTPC Limited
    Commissioning
    Dec 2023
  19. 2023Rourkela PP-II Expansion ProjectNSPCL1 × 250 MWOdishaFly ashBottom ashSlurryHCSD

    Fly ash system

    System
    Two-stage dense phase pneumatic pressure conveying
    Capacity
    Stage I: 97 TPHStage II: 2 × 97 TPH (1 working, 1 standby)
    Conveying distance
    Stage I: 300 mStage II: about 1,150 m

    Bottom ash system

    System
    Water-impounded bottom ash hopper, jet pumps and slurry pumps
    Capacity
    2 × 65 TPH

    Slurry disposal and HCSD

    System
    Lean slurry disposal, bottom ash
    Capacity
    3 streams of 630 m³/h (1 working, 1 standby, 1 maintenance standby), 2 pipelines
    Pumping distance
    6,000 m, 39.5 m static head
    System
    High concentration slurry disposal (HCSD), fly ash
    Capacity
    2 × 90 TPH (1 working, 1 standby)
    Pumping distance
    6,000 m, 39.5 m static head
    Owner
    NTPC-SAIL Power Company Ltd.
    Executed through
    BHEL-ISG, Bengaluru
    Commissioning
    Mar 2023
  20. 2022Sri Damodaram Sanjeevaiah TPS, KrishnapatnamAPPDCL1 × 800 MW (Unit 3)Andhra PradeshFly ashBottom ashSlurryHCSD

    Fly ash system

    System
    Vacuum extraction (Stage I), then dense phase pressure conveying (Stage II); dense phase also for Stage III
    Capacity
    Stage I: 8 × 40 TPHStage II: 5 streams of 80 TPH (4 working, 1 standby)
    Conveying distance
    Stage I: 80 mStage II: 480 m

    Bottom ash system

    System
    Water-impounded bottom ash hopper, jet pumps, dewatering bins (Hydrobins) and slurry pumps
    Capacity
    3 × 75 TPH

    Slurry disposal and HCSD

    System
    Lean slurry disposal, bottom ash
    Capacity
    3 streams of 980 m³/h (1 working, 1 standby, 1 maintenance standby)
    Pumping distance
    6,250 m, 21 m static head
    System
    High concentration slurry disposal (HCSD), fly ash
    Capacity
    2 × 140 TPH (1 working, 1 standby)
    Pumping distance
    6,250 m, 40 m static head
    Owner
    Andhra Pradesh Power Development Company Ltd.
    Executed through
    Tata Power, Hyderabad
    Commissioning
    Mar 2022
  21. 2021Sipat STPP, Stage I (augmentation of dry fly ash transportation, Units 2 & 3)NTPC3 × 660 MWChhattisgarhFly ash

    Fly ash system

    System
    Dense phase pneumatic pressure conveying
    Capacity
    288 TPH per unit: 4 streams of 96 TPH (3 working, 1 standby)
    Conveying distance
    935 m
    Owner
    NTPC Limited
    Commissioning
    Aug 2021
  22. 2017Yermarus Thermal Power Station, RaichurRPCL2 × 800 MWKarnatakaFly ashBottom ashSlurry

    Fly ash system

    System
    Vacuum extraction (Stage I), then dense phase pressure conveying (Stage II)
    Capacity
    Stage I: 6 × 66 TPH per unitStage II: 3 × 132 TPH
    Conveying distance
    Stage I: 70 mStage II: 850 m

    Bottom ash system

    System
    Water-impounded bottom ash hopper, jet pumps and slurry pumps; bottom ash overflow (BAOF) slurry pumped to the ash dyke
    Capacity
    3 × 77 TPH

    Slurry disposal and HCSD

    System
    Lean slurry disposal
    Capacity
    6 × 755 m³/h at 45.37 MWC
    Pumping distance
    16,000 m
    Owner
    Raichur Power Corporation Ltd.
    Executed through
    BHEL-ISG, Bengaluru
    Commissioning
    Unit 1: Oct 2016Unit 2: Mar 2017
  23. 2017Bokaro A TPSDVC1 × 500 MWJharkhandFly ashBottom ashSlurry

    Fly ash system

    System
    Vacuum extraction by mechanical exhauster (Stage I), then dense phase pressure conveying (Stage II)
    Capacity
    Stage I: 4 × 60 TPHStage II: 2 × 120 TPH
    Conveying distance
    750 m

    Bottom ash system

    System
    Water-impounded bottom ash hopper, jet pumps and slurry pumps
    Capacity
    2 × 75 TPH

    Slurry disposal and HCSD

    System
    Lean slurry disposal
    Capacity
    720 to 775 m³/h at 18 to 20 MWC
    Pumping distance
    3 × 750 m
    Owner
    Damodar Valley Corporation
    Executed through
    BHEL-ISG, Bengaluru
    Commissioning
    Jan 2017
  24. 2017Parli TPPMAHAGENCO1 × 250 MWMaharashtraFly ashBottom ashSlurry

    Fly ash system

    System
    Vacuum extraction (Stage I), then dense phase pressure conveying (Stage II)
    Capacity
    Stage I: 4 × 45 TPHStage II: 4 × 45 TPH
    Conveying distance
    Stage I: 100 mStage II: about 1,000 m

    Bottom ash system

    System
    Water-impounded bottom ash hopper, jet pumps and slurry pumps
    Capacity
    2 × 65 TPH

    Slurry disposal and HCSD

    System
    Lean slurry disposal
    Capacity
    650 m³/h at 50 MWC
    Pumping distance
    2,500 m
    Owner
    Maharashtra State Power Generation Company Ltd.
    Executed through
    Sunil Hi-Tech Engineers, Nagpur
    Commissioning
    Mar 2017
  25. 2016Marwa Thermal Power PlantCSPGCL2 × 500 MWChhattisgarhFly ashBottom ashSlurryHCSD

    Fly ash system

    System
    Vacuum extraction (Stage I), then dense phase pressure conveying (Stage II)
    Capacity
    Stage I: 4 × 60 TPHStage II: 2 × 120 TPH
    Conveying distance
    Stage I: 100 mStage II: about 1,000 m

    Bottom ash system

    System
    Water-impounded bottom ash hopper, jet pumps and slurry pumps
    Capacity
    2 × 75 TPH

    Slurry disposal and HCSD

    System
    Lean slurry disposal
    Capacity
    620 m³/h at 47 MWC
    Pumping distance
    7,000 m
    System
    High concentration slurry disposal (HCSD)
    Capacity
    175 m³/h
    Owner
    Chhattisgarh State Power Generation Company Ltd.
    Executed through
    BGR Energy Systems, Chennai
    Commissioning
    Unit 1: Feb to Mar 2016 (COD)Unit 2: Jul to Aug 2016
  26. 2016Anpara D TPSUPRVUNL2 × 500 MW (Units 6 & 7)Uttar PradeshFly ashBottom ashSlurry

    Fly ash system

    System
    Single-stage dense phase pneumatic pressure conveying, with slurry disposal
    Capacity
    2 × 230 TPH
    Conveying distance
    600 m

    Bottom ash system

    System
    Water-impounded bottom ash hopper, jet pumps and slurry pumps
    Capacity
    2 × 82 TPH

    Slurry disposal and HCSD

    System
    Lean slurry disposal
    Capacity
    965 m³/h at 49 MWC
    Pumping distance
    3 × 14,000 m
    System
    Ash water recovery system (AWRS)
    Capacity
    1,350 m³/h at 130 MWC
    Owner
    Uttar Pradesh Rajya Vidyut Utpadan Nigam Ltd.
    Executed through
    BHEL-ISG, Bengaluru
    Commissioning
    Unit 6: May 2016Unit 7: Oct 2016
  27. 2016Chandrapur Expansion TPPMAHAGENCO2 × 500 MW (Units 8 & 9)MaharashtraFly ashBottom ashSlurry

    Fly ash system

    System
    Single-stage dense phase pneumatic pressure conveying, with slurry disposal
    Capacity
    240 TPH
    Conveying distance
    510 m

    Bottom ash system

    System
    Water-impounded bottom ash hopper, jet pumps and slurry pumps
    Capacity
    2 × 75 TPH

    Slurry disposal and HCSD

    System
    Lean slurry disposal
    Capacity
    975 m³/h at 47.5 MWC
    Pumping distance
    2 × 15,000 m
    Owner
    Maharashtra State Power Generation Company Ltd.
    Executed through
    BGR Energy Systems, Chennai
    Commissioning
    Unit 8: Nov 2015Unit 9: Sep 2016
  28. 2015Vindhyachal Super Thermal Power Station, Stage VNTPC1 × 500 MWMadhya PradeshFly ashBottom ashSlurry

    Fly ash system

    System
    Vacuum extraction (Stage I), then dense phase pressure conveying (Stage II)
    Capacity
    Stage I: 4 × 48.67 TPHStage II: 2 × 97.33 TPH
    Conveying distance
    Stage I: 70 mStage II: about 1,050 m

    Bottom ash system

    System
    Water-impounded bottom ash hopper, jet pumps and slurry pumps, with ash water recovery (AWRS)
    Capacity
    2 × 61.5 TPH

    Slurry disposal and HCSD

    System
    Lean slurry disposal
    Capacity
    1,250 m³/h at 43.5 MWC
    Pumping distance
    2 × 10,500 m
    Owner
    NTPC Limited
    Commissioning
    Sep 2015
  29. 2015Tuticorin TPPNTPL2 × 500 MWTamil NaduBottom ash

    Bottom ash system

    System
    Scraper chain conveyor
    Capacity
    4 × 40 TPH
    Owner
    NLC Tamil Nadu Power Ltd.
    Executed through
    BHEL-ISG, Bengaluru
    Commissioning
    Unit 1: Mar 2015Unit 2: Jun 2015
  30. 2014Mouda Super Thermal Power StationNTPC2 × 500 MWMaharashtraFly ashBottom ashSlurryHCSD

    Fly ash system

    System
    Vacuum extraction (Stage I), then dense phase pressure conveying (Stage II)
    Capacity
    Stage I: 4 × 63.33 TPHStage II: 3 × 126.66 TPH
    Conveying distance
    Stage I: 70 mStage II: about 1,030 m

    Bottom ash system

    System
    Water-impounded bottom ash hopper, jet pumps and slurry pumps
    Capacity
    2 × 85 TPH

    Slurry disposal and HCSD

    System
    Lean slurry disposal
    Capacity
    872 m³/h at 45 MWC
    Pumping distance
    3 × 4,000 m
    System
    High concentration slurry disposal (HCSD), bottom ash and fly ash
    Capacity
    190 TPH
    Pumping distance
    4,000 m
    Owner
    NTPC Limited
    Commissioning
    Dec 2014
  31. 2014Chhabra TPSRRVUNL2 × 250 MW (Units 3 & 4)RajasthanFly ash

    Fly ash system

    System
    Dense phase pneumatic pressure conveying
    Capacity
    Stage I: 60 TPHStage II: 100 TPH
    Conveying distance
    Stage I: 365 mStage II: 1,000 m per stream
    Owner
    Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
    Executed through
    Grasim Industries, Mumbai
    Commissioning
    Unit 3: Dec 2013Unit 4: Mar 2014
  32. 2014Korba West TPS (HTPS)CSPGCL4 × 210 MWChhattisgarhFly ashBottom ashSlurryHCSD

    Fly ash system

    System
    Dense phase pneumatic pressure conveying
    Capacity
    112 TPH per unit
    Conveying distance
    600 to 850 m (Unit 1: 600 mUnit 2: 640 mUnit 3: 800 mUnit 4: 850 m)

    Bottom ash system

    System
    Dewatering bins (Hydrobins) with sedimentation and settling tanks; bottom ash and fly ash then go to HCSD

    Slurry disposal and HCSD

    System
    High concentration slurry disposal (HCSD)
    Capacity
    175 m³/h
    Pumping distance
    12,000 m
    Owner
    Chhattisgarh State Power Generation Company Ltd.
    Commissioning
    Fly ash: Units 1 & 2 May 2011, Unit 3 Aug 2011, Unit 4 Nov 2011HCSD: Dec 2013 to Jan 2014
  33. 2013Kalisindh TPPRRVUNL2 × 600 MW (Unit 1)RajasthanFly ashBottom ash

    Fly ash system

    System
    Single-stage dense phase pneumatic pressure conveying
    Capacity
    210 TPH
    Conveying distance
    800 m

    Bottom ash system

    System
    Water-impounded bottom ash hopper, jet pumps and slurry pumps
    Capacity
    3 × 60 TPH
    Owner
    Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
    Executed through
    Wonder Cement (fly ash); BGR Energy Systems (bottom ash)
    Commissioning
    Sep 2013
    Note
    Operation and maintenance by Macawber Beekay.
  34. 2013Kalisindh TPPRRVUNL2 × 600 MW (Unit 2)RajasthanFly ashBottom ash

    Fly ash system

    System
    Single-stage dense phase pneumatic pressure conveying
    Capacity
    210 TPH
    Conveying distance
    700 m

    Bottom ash system

    System
    Water-impounded bottom ash hopper, jet pumps and slurry pumps
    Owner
    Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
    Executed through
    Ambuja Cement (fly ash); BGR Energy Systems (bottom ash)
    Commissioning
    Dec 2013
    Note
    Operation and maintenance by Macawber Beekay.
  35. 2013Ukai TPPGSECL1 × 500 MW (Unit 6)GujaratFly ashBottom ash

    Fly ash system

    System
    Single-stage dense phase pneumatic pressure conveying
    Capacity
    210 TPH
    Conveying distance
    300 m

    Bottom ash system

    System
    Submerged scraper chain conveyor, belt conveyor and disposal
    Capacity
    2 × 45 TPH
    Owner
    Gujarat State Electricity Corporation Ltd.
    Executed through
    BHEL-ISG, Bengaluru
    Commissioning
    Bottom ash: Dec 2012Fly ash: Mar to Apr 2013
    Note
    Operation and maintenance by Macawber Beekay.
  36. 2012Mettur TPPTNEB1 × 600 MWTamil NaduFly ashBottom ashSlurry

    Fly ash system

    System
    Vacuum extraction (Stage I), then dense phase pressure conveying (Stage II)
    Capacity
    Stage I: 4 × 73.5 TPHStage II: 2 × 147 TPH
    Conveying distance
    Stage I: 80 mStage II: 900 m

    Bottom ash system

    System
    Dry bottom ash conveyor (DRYCON)
    Capacity
    45 TPH normal, 90 TPH design

    Slurry disposal and HCSD

    System
    Lean slurry disposal
    Capacity
    460 m³/h at 42 MWC
    Pumping distance
    4,000 m
    Owner
    Tamil Nadu Electricity Board
    Executed through
    BGR Energy Systems, Chennai
    Commissioning
    Nov 2012 (COD Dec 2012)
  37. 2012Sikka TPP, JamnagarGSECL2 × 250 MW (Units 3 & 4)GujaratFly ashBottom ash

    Fly ash system

    System
    Single-stage dense phase pneumatic pressure conveying, with slurry disposal
    Capacity
    30.2 TPH per stream (4 streams)
    Conveying distance
    900 m

    Bottom ash system

    System
    Submerged scraper chain conveyor, belt conveyor and disposal
    Capacity
    4 × 5 TPH
    Owner
    Gujarat State Electricity Corporation Ltd.
    Executed through
    BHEL-ISG, Bengaluru
    Commissioning
    Dec 2012
  38. 2012Korba East TPSCSPGCL4 × 50 MW + 2 × 120 MWChhattisgarhFly ashBottom ashSlurryHCSD

    Fly ash system

    System
    Vacuum extraction by mechanical exhauster (Stage I), then dense phase pressure conveying (Stage II)
    Capacity
    Units 1 to 4: 50 TPHUnits 5 & 6: 60 TPH
    Conveying distance
    Stage I: 60 mStage II: 500 m

    Bottom ash system

    System
    Dewatering bins with sedimentation and settling tanks; bottom ash and fly ash then go to HCSD

    Slurry disposal and HCSD

    System
    High concentration slurry disposal (HCSD)
    Capacity
    135 m³/h
    Pumping distance
    9,500 m
    Owner
    Chhattisgarh State Power Generation Company Ltd.
    Commissioning
    Fly ash: May to Nov 2011HCSD: Sep 2012
  39. 2011Suratgarh TPSRRVUNL1 × 250 MW (Unit 6)RajasthanFly ash

    Fly ash system

    System
    Dense phase pneumatic pressure conveying
    Capacity
    100 TPH
    Conveying distance
    200 m
    Owner
    Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
    Executed through
    Grasim Cement and Shree Cement
    Commissioning
    Jan 2011
  40. 2011Korba West TPS (renovation)CSPGCL4 × 210 MWChhattisgarhFly ash

    Fly ash system

    System
    Vacuum extraction by mechanical exhauster (Stage I), then dense phase pressure conveying (Stage II)
    Capacity
    Units 1 to 4: 50 TPHUnits 5 & 6: 60 TPH
    Conveying distance
    Stage I: 60 mStage II: 500 m
    Owner
    Chhattisgarh State Power Generation Company Ltd.
    Commissioning
    Units 1 & 2: May 2011Units 3 & 4: Aug and Nov 2011
  41. 2011Obra TPPUPRVUNL1 × 200 MW (Units 9, 10 & 11)Uttar PradeshFly ash

    Fly ash system

    System
    Dense phase pneumatic pressure conveying
    Capacity
    Unit 9: 54 TPH
    Conveying distance
    300 m
    Owner
    Uttar Pradesh Rajya Vidyut Utpadan Nigam Ltd.
    Executed through
    Jaiprakash Associates, Noida
    Commissioning
    Mar 2011
  42. 2011Sikka TPPGSECL2 × 120 MW (Units 1 & 2)GujaratFly ash

    Fly ash system

    System
    Dense phase pneumatic pressure conveying
    Capacity
    Stage I: 2 × 20 TPHStage II: 2 × 35 TPH
    Conveying distance
    Stage I: 150 mStage II: 1,550 m
    Owner
    Gujarat State Electricity Corporation Ltd.
    Executed through
    Shree Digvijay Cement, Jamnagar
    Commissioning
    Jan 2011
  43. 2011Kothagudem TPS, Stations A, B & CAPGENCO4 × 60 MW + 4 × 120 MW (Units 1 to 8)TelanganaFly ash

    Fly ash system

    System
    Vacuum extraction by mechanical exhauster (Stage I), then dense phase pressure conveying (Stage II)
    Capacity
    Stage I: 42 TPH per unit (Units 1 to 4), 2 × 45 TPH per unit (Units 5 to 8)Stage II: 50 TPH per unit (Units 1 to 4), 100 TPH (Units 5 to 8)
    Conveying distance
    Stage I: 80 to 90 mStage II: 1,000 m (Units 1 to 4), 1,200 m (Units 5 to 8)
    Owner
    Andhra Pradesh Power Generation Corporation Ltd.
    Commissioning
    Units 1 to 4: Jun to Dec 2010Units 5 to 8: Jun to Oct 2011
  44. 2010Chhabra TPSRRVUNL2 × 250 MW (Units 1 & 2)RajasthanFly ashBottom ash

    Fly ash system

    System
    Dry fly ash collection and transportation
    Capacity
    Stage I: 75 TPH per unitStage II: 112 TPH per unit
    Conveying distance
    1,000 m

    Bottom ash system

    System
    Scraper chain conveyor
    Capacity
    36 TPH
    Owner
    Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
    Executed through
    Grasim Industries and Shree Cement (fly ash); Punj Lloyd (bottom ash)
    Commissioning
    Unit 1: Oct 2009Unit 2: May 2010
  45. 2010Suratgarh STPPRRVUNL3 × 250 MW (Units 3, 4 & 5)RajasthanFly ash

    Fly ash system

    System
    Dense phase pneumatic pressure conveying
    Capacity
    100 TPH
    Conveying distance
    200 m
    Owner
    Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
    Executed through
    Shree Cement, Beawar
    Commissioning
    Jan 2010
  46. 2010Rayalaseema TPP, Stage IIIAPGENCO1 × 210 MW (Unit 5)Andhra PradeshFly ashBottom ashSlurry

    Fly ash system

    System
    Vacuum extraction by mechanical exhauster (Stage I), then dense phase pressure conveying (Stage II)
    Capacity
    Stage I: 4 × 45 TPHStage II: 2 × 90 TPH
    Conveying distance
    Stage I: 75 mStage II: 1,200 m

    Bottom ash system

    System
    Water-impounded bottom ash hopper, jet pumps and slurry pumps
    Capacity
    2 × 65 TPH

    Slurry disposal and HCSD

    System
    Lean slurry disposal
    Capacity
    240 m³/h at 41 MWC
    Pumping distance
    5,500 m
    Owner
    Andhra Pradesh Power Generation Corporation Ltd.
    Commissioning
    Nov 2010
  47. 2010Panipat TPSHPGCL2 × 110 MW + 1 × 210 MWHaryanaFly ash

    Fly ash system

    System
    Vacuum extraction by mechanical exhauster (Stage I), then dense phase pressure conveying (Stage II)
    Capacity
    Stage I: 2 × 30 TPH per 110 MW unit, 4 × 30 TPH for the 210 MW unitStage II: 60 TPH per unit
    Conveying distance
    Stage I: 100 mStage II: 1,300 m
    Owner
    Haryana Power Generation Corporation Ltd.
    Executed through
    Jaiprakash Associates, Noida
    Commissioning
    Unit 5: Mar 2010Unit 4: May 2010Unit 3: Jul 2010
  48. 2009Giral Lignite TPPRRVUNL1 × 125 MW (Unit 2)RajasthanFly ashBottom ash

    Fly ash system

    System
    Dense phase pneumatic pressure conveying
    Capacity
    65 TPH
    Conveying distance
    760 m

    Bottom ash system

    System
    Bed ash by scraper chain conveyor
    Capacity
    20 TPH
    Owner
    Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
    Executed through
    Tata Power, Hyderabad
    Commissioning
    Jan 2009
  49. 2008Chandrapur TPSMSEB2 × 500 MW (Units 5 & 6)MaharashtraFly ash

    Fly ash system

    System
    Dense phase pneumatic pressure conveying
    Capacity
    Stage I: 70 TPHStage II: 70 TPH
    Conveying distance
    Stage I: 250 mStage II: 700 m
    Owner
    Maharashtra State Electricity Board
    Executed through
    UltraTech Cement, Mumbai
    Commissioning
    Jun 2008
  50. 2008Guru Hargobind TPP, Lehra MohabbatPSEB2 × 250 MW (Units 3 & 4)PunjabFly ashBottom ashSlurry

    Fly ash system

    System
    Dense phase pneumatic pressure conveying
    Capacity
    2 × 120 TPH
    Conveying distance
    320 m

    Bottom ash system

    System
    Water-impounded bottom ash hopper, jet pumps and slurry pumps
    Capacity
    2 × 60 TPH

    Slurry disposal and HCSD

    System
    Lean slurry disposal
    Capacity
    700 m³/h at 41 MWC
    Pumping distance
    2 × 2,000 m
    Owner
    Punjab State Electricity Board
    Executed through
    BHEL-ISG, Bengaluru
    Commissioning
    Unit 3: Jan 2008Unit 4: Jul 2008
  51. 2008Mejia TPS (Boilers 1, 2 & 3)DVC3 × 210 MWWest BengalFly ash

    Fly ash system

    System
    Dense phase pneumatic pressure conveying
    Capacity
    Stage I: 3 × 37.5 TPHStage II: 100 TPH
    Conveying distance
    1,600 m
    Owner
    Damodar Valley Corporation
    Executed through
    Lafarge India, Kolkata
    Commissioning
    Jun 2008
  52. 2008Rayalaseema TPP, Stage IIAPGENCO2 × 210 MW (Units 3 & 4)Andhra PradeshSlurry

    Slurry disposal and HCSD

    System
    Ash slurry disposal (design, supply, erection and commissioning)
    Capacity
    68 TPH per stream, 2 streams (80 m³/h)
    Pumping distance
    15,000 m
    Owner
    Andhra Pradesh Power Generation Corporation Ltd.
    Commissioning
    Sep 2008
  53. 2008Giral Lignite TPPRRVUNL1 × 125 MW (Unit 1)RajasthanFly ashBottom ash

    Fly ash system

    System
    Dense phase pneumatic pressure conveying
    Capacity
    65 TPH
    Conveying distance
    600 m

    Bottom ash system

    System
    Bed ash by drag chain conveyor
    Capacity
    20 TPH
    Owner
    Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
    Commissioning
    May 2008
  54. 2007Kota TPSRRVUNL1 × 210 MW (Unit 3)RajasthanFly ash

    Fly ash system

    System
    Dense phase pneumatic pressure conveying
    Capacity
    80 TPH
    Conveying distance
    1,250 m
    Owner
    Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
    Executed through
    Birla Corporation, Chanderia
    Commissioning
    May 2007
  55. 2007Rayalaseema TPPAPGENCO4 × 210 MW (Units 1 to 4)Andhra PradeshFly ash

    Fly ash system

    System
    Dense phase pneumatic pressure conveying
    Capacity
    90 TPH per stream
    Conveying distance
    1,800 m
    Owner
    Andhra Pradesh Power Generation Corporation Ltd.
    Commissioning
    Jun 2007
  56. 2007Kota TPSRRVUNL2 × 110 MW (Units 1 & 2)RajasthanFly ash

    Fly ash system

    System
    Vacuum extraction by mechanical exhauster (Stage I), then dense phase pressure conveying (Stage II)
    Capacity
    Stage I: 2 × 30 TPHStage II: 50 TPH
    Conveying distance
    Stage I: 170 mStage II: 1,500 m
    Owner
    Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
    Executed through
    ACC, Mumbai
    Commissioning
    Apr 2007
  57. 2006Kota TPSRRVUNL2 × 210 MW (Units 4 & 5)RajasthanFly ash

    Fly ash system

    System
    Dense phase pneumatic pressure conveying
    Capacity
    Stage I: 80 TPHStage II: 100 TPH
    Conveying distance
    750 m
    Owner
    Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
    Executed through
    Grasim Industries, Mumbai
    Commissioning
    Unit 5: Aug 2006Unit 4: Oct 2006
  58. 2005Chandrapur TPSMSEB2 × 500 MW (Units 6 & 7)MaharashtraFly ash

    Fly ash system

    System
    Dense phase pneumatic pressure conveying
    Capacity
    62 TPH
    Conveying distance
    about 900 m
    Owner
    Maharashtra State Electricity Board
    Executed through
    ACC (Chanda Cement Works)
    Commissioning
    Dec 2005
  59. 2005Bandel TPPWBPDCL1 × 210 MW (Unit 5)West BengalFly ash

    Fly ash system

    System
    Vacuum extraction by mechanical exhauster (Stage I), then dense phase pressure conveying (Stage II)
    Capacity
    2 × 35 TPH and 2 × 50 TPH
    Conveying distance
    Stage I: 100 to 120 mStage II: 550 m
    Owner
    West Bengal Power Development Corporation Ltd.
    Commissioning
    Aug 2005
  60. 2003Mettur TPSTNEB1 × 210 MW (Unit 2)Tamil NaduFly ash

    Fly ash system

    System
    Dense phase pneumatic pressure conveying
    Capacity
    50 TPH
    Conveying distance
    520 m
    Owner
    Tamil Nadu Electricity Board
    Executed through
    ACC, Mumbai
    Commissioning
    Feb 2003
  61. 2003Mettur TPSTNEB1 × 210 MW (Unit 1)Tamil NaduFly ash

    Fly ash system

    System
    Dense phase pneumatic pressure conveying
    Capacity
    80 TPH
    Conveying distance
    525 m
    Owner
    Tamil Nadu Electricity Board
    Executed through
    Grasim Cement, Mumbai
    Commissioning
    Oct 2003
  62. 2003Mettur TPSTNEB1 × 210 MW (Unit 4)Tamil NaduFly ash

    Fly ash system

    System
    Dense phase pneumatic pressure conveying
    Capacity
    60 TPH
    Conveying distance
    350 m
    Owner
    Tamil Nadu Electricity Board
    Executed through
    Chettinad Cement, Tamil Nadu
    Commissioning
    Dec 2003
  63. 2001Khaperkheda TPSMSEB2 × 210 MW (Units 3 & 4)MaharashtraBottom ash

    Bottom ash system

    System
    Water-impounded bottom ash hopper and jet pumps
    Capacity
    4 × 60 TPH (2 working, 2 standby)
    Owner
    Maharashtra State Electricity Board
    Commissioning
    May 2000 to Jan 2001
  64. 1999Raichur TPSKPCL2 × 210 MW (Units 1 & 2)KarnatakaFly ash

    Fly ash system

    System
    Vacuum extraction by mechanical exhauster (Stage I), then dense phase pressure conveying (Stage II)
    Capacity
    Stage I: 3 × 30 TPHStage II: 70 TPH
    Conveying distance
    Stage I: 85 mStage II: 950 m
    Owner
    Karnataka Power Corporation Ltd.
    Executed through
    ACC (P&E Division), Thane
    Commissioning
    Aug 1999
  65. —Suratgarh Super Critical TPPRRVUNL2 × 660 MW (Units 7 & 8)RajasthanFly ashBottom ashSlurry

    Fly ash system

    System
    Two-stage dense phase pneumatic pressure conveying
    Capacity
    Stage I: 260 TPHStage II: 2 × 130 TPH
    Conveying distance
    Stage I: 550 mStage II: about 1,200 m

    Bottom ash system

    System
    Water-impounded bottom ash hopper, jet pumps and slurry pumps
    Capacity
    2 × 120 TPH

    Slurry disposal and HCSD

    System
    Lean slurry disposal
    Capacity
    965 m³/h at 46 MWC
    Pumping distance
    4 × 4,000 m
    Owner
    Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
    Executed through
    BHEL-ISG, Bengaluru
    Commissioning
    Commissioned
  66. —New Neyveli Lignite TPPNLC2 × 500 MWTamil NaduFly ashBottom ashSlurry

    Fly ash system

    System
    Vacuum extraction (Stage I), then dense phase pressure conveying (Stage II)
    Capacity
    Stage I: 86 TPH, ESP to buffer hopperStage II: 86 TPH, buffer hopper to main silo
    Conveying distance
    Stage I: 150 mStage II: 1,000 m

    Bottom ash system

    System
    Water-impounded hopper with submerged scraper chain conveyor and belt conveyor
    Capacity
    97 TPH wet; belt conveyor 45 TPH

    Slurry disposal and HCSD

    System
    Lean slurry disposal
    Capacity
    1,250 m³/h at 40 MWC
    Pumping distance
    3,000 m
    Owner
    Neyveli Lignite Corporation Ltd.
    Executed through
    Essar Projects India, Mumbai
    Commissioning
    Commissioned
  67. —Barauni TPPBSEB2 × 250 MWBiharFly ashBottom ashSlurry

    Fly ash system

    System
    Vacuum extraction by mechanical exhauster (Stage I), then dense phase pressure conveying (Stage II)
    Capacity
    Stage I: 4 × 66 TPHStage II: 2 × 132 TPH
    Conveying distance
    Stage I: 150 mStage II: 550 m

    Bottom ash system

    System
    Water-impounded bottom ash hopper, jet pumps and slurry pumps
    Capacity
    2 × 60 TPH

    Slurry disposal and HCSD

    System
    Lean slurry disposal
    Capacity
    630 m³/h at 38 MWC
    Pumping distance
    6,000 m
    Owner
    Bihar State Electricity Board
    Executed through
    BHEL-ISG, Bengaluru
    Commissioning
    Commissioned

목록 보는 방법

각 행은 하나의 프로젝트이며, 준공 연도(또는 '수행 중'), 발전소, 발주처, 호기 구성, 주(州)를 표시합니다. 태그는 Macawber Beekay가 공급한 시스템을 나타냅니다. 행을 열면 각 시스템의 사양과 호기별 준공 일자를 확인할 수 있습니다.

  • 비산재 시스템: 건식 비산재를 ESP, 공기예열기, 절탄기 호퍼에서 사일로까지 이송하는 방식과 이송 용량 및 거리. 비산재 처리를 참조하십시오.
  • 바닥재 시스템: 보일러 하부에서 굵은 회를 배출하는 방식과 그 용량. 바닥재 처리를 참조하십시오.
  • 슬러리 처리 및 HCSD: 회를 저농도 슬러리 또는 고농도 슬러리로 회처리장이나 광산까지 펌핑하는 방식과 펌프 용량 및 배관 길이. 회 슬러리 처리를 참조하십시오.
  • 수행 경로: EPC 계약자나 시멘트 회사를 통해 수주한 경우 해당 회사를 표시합니다.

사양에 사용된 용어

용어 의미
TPH 시간당 톤: 건식 회의 이송 용량
m³/h 시간당 세제곱미터: 슬러리 펌핑 용량
MWC 수주(水柱) 미터: 펌프의 토출 양정
Stage I / Stage II 2단 비산재 시스템: Stage I은 호퍼의 회를 버퍼 또는 중간 사일로로 모으고, Stage II는 이를 주 사일로로 이송
운전 / 예비 동시에 운전하는 이송 계통 또는 펌프의 수와 예비로 두는 수
HCSD 고농도 회 슬러리 처리: 고형분 농도를 높여 훨씬 적은 물로 회를 펌핑
AWRS 회수(灰水) 회수 시스템: 회처리장 또는 침전지에서 회수(灰水)를 회수
BAOF 바닥재 오버플로: 바닥재 시스템의 슬러리로, 회처리장 또는 탈수 빈으로 펌핑됨
정양정 슬러리 배관이 극복해야 하는 높이 차
COD 상업 운전 개시일

목록에서 알 수 있는 것

  • 50 MW부터 800 MW까지의 호기 규모. 가장 오래된 프로젝트인 KPCL의 Raichur TPS는 1999년 8월에 준공되었습니다. 최근 수주는 주로 660 MW 및 800 MW 호기입니다.
  • 최대 1,800 m의 비산재 이송(APGENCO의 Rayalaseema TPP), 그리고 Stage I이 최대 363 TPH를 이송하는 2단 시스템(NTPC의 Telangana STPP).
  • 최대 16,000 m의 슬러리 배관(Raichur의 Yermarus Thermal Power Station), Bhusawal과 Korba West의 12,000 m HCSD 배관, 그리고 Korba West 2 × 660 MW용으로 설계 중인 13,000 m 배관.
  • 광산 공동(空洞)으로의 회 처리: NTPC Talcher Stage II, 회수(灰水) 회수 포함.

더 읽어보기

최종 검토일

엔지니어와 상담하기

노이다 본사의 엔지니어링 팀이 당사가 구축하는 모든 시스템에 대한 기술 문의에 성실히 답변해 드립니다.

문의하기+91 120 450 7700
Macawber Beekay가 회처리 시스템을 구축한 NTPC 발전소는 어디인가요?

준공된 NTPC 실적으로는 Mouda(2 × 500 MW), Vindhyachal Stage V(1 × 500 MW), Sipat Stage I 건식 비산재 증설(3 × 660 MW), Rihand Stage III(2 × 500 MW), Telangana STPP(2 × 800 MW), North Karanpura(3 × 660 MW)가 있으며, Rourkela의 NSPCL(NTPC-SAIL Power Company)과 방글라데시 BIFPCL의 Maitree 프로젝트도 포함됩니다. Lara Stage II, Talcher, Rihand Stage I은 현재 수행 중입니다.

Macawber Beekay의 실적 목록에 포함된 주 전력공사는 어디인가요?

주 단위 실적으로는 RRVUNL(라자스탄), MAHAGENCO 및 구 MSEB(마하라슈트라), GSECL(구자라트), CSPGCL(차티스가르), APGENCO 및 APPDCL(안드라프라데시), TNEB 및 TANGEDCO(타밀나두), UPRVUNL(우타르프라데시), HPGCL(하리아나), WBPDCL(서벵골), KPCL 및 Raichur Power Corporation(카르나타카), Bihar State Electricity Board, PSEB(펀자브), SCCL(텔랑가나)이 있습니다.

Macawber Beekay는 고농도 회 슬러리 처리(HCSD) 시스템을 공급한 적이 있나요?

예. 목록의 프로젝트 중 열다섯 건에 HCSD가 포함되어 있으며, CSPGCL의 Korba West와 Korba East, NTPC Mouda, Telangana STPP, North Karanpura, GSECL의 Wanakbori, MAHAGENCO의 Bhusawal, NSPCL Rourkela 등이 있습니다. 목록상 HCSD 배관 길이는 Bhusawal과 Korba West에서 최대 12,000 m이며, 현재 설계 중인 Korba West 2 × 660 MW에서는 13,000 m입니다.

이 회처리 실적은 어느 정도 규모의 발전 호기를 포괄하나요?

목록은 Korba East의 50 MW 호기부터 Yermarus, Wanakbori, Krishnapatnam, Telangana STPP, Lara의 800 MW 호기까지 포괄합니다. 최근 수주는 주로 660 MW 및 800 MW 호기이며, 목록에서 가장 오래된 프로젝트인 KPCL의 Raichur TPS는 1999년 8월에 준공되었습니다.

엔지니어와 상담하기.

신규 플랜트 건설이나 기존 설비 성능 개선을 계획하고 계십니까? 노이다 본사의 엔지니어링 팀이 상세한 기술 자문을 제공해 드립니다.