Case studies
How our ash handling and coal mill rejects systems were engineered for real PF and CFBC boilers: the client's requirement, the system we built and how it performs.
- Coal Mill Rejects Handling System for PF BoilersDenseveyor dense phase system conveying rejects from 14 coal mills to bunkers, built for BHEL at NTPC SAIL Power Company Stage II (2 x 250 MW).
- Bottom Ash (Jet Pump) and Fly Ash (Vacuum and Positive Pressure) Handling System for PF BoilersJet pump bottom ash and vacuum plus pressure fly ash handling, with ash water recovery, supplied for BHEL at the 2 x 520 MW Vizag thermal power plant.
- Bottom Ash (SSCC) and Fly Ash (Dense Phase) Handling System for PF BoilersSSCC bottom ash, dense phase fly ash and HCSD for Jindal India Thermal Power's 2 x 600 MW plant at Derang, Angul, Odisha, from design to commissioning.
- Bed Ash, Fly Ash and Bed Material Handling System for CFBC BoilersDense phase bed ash, fly ash, bed material and limestone conveying for HMEL's 2 x 300 TPH CFBC boilers at the Guru Gobind Singh Refinery, Bhatinda, Punjab.
Talk to our engineers.
Planning a new plant or upgrading one? Our engineering team in Noida is ready to help.