Macawber Beekay · Est. 1986
Engineered to commission.
Ash handling systems, coal handling plants and dense phase conveying, designed, manufactured and commissioned by one company. Macawber Beekay was established in 1986; the family enterprise behind it began in 1918.

Trusted by
100+ clients across power, metals, cement and EPC. See all
- F-011986Established
- F-02100+Worldwide clients
- F-031,500+Experienced workers
- F-041,500+Working installations
01Flagship
Ash handling systems.
From the furnace bottom to the silo, every stage engineered as one plant.

02Systems
Every system on the material's route.
From the coal that enters a plant to the ash that leaves it.
- S-01Spec sheet
Coal handlingFrom wagon tippler to boiler bunker.MaterialCoalFromWagon tipplerToBoiler bunkerLearn more about coal handling - S-02Spec sheet
Bottom ash handlingFurnace-bottom ash, handled wet, semi-dry or dry.MaterialBottom ashFromFurnace bottomMethodWet, semi-dry or dryLearn more about bottom ash handling - S-03Spec sheet
Fly ash handlingDense phase and vacuum conveying to silo.MaterialFly ashMethodDense phase · VacuumToSiloLearn more about fly ash handling - S-04Spec sheet
Slurry disposalLean slurry and HCSD, with water recovery.MaterialAsh slurryMethodLean slurry · HCSDRecoveryWaterLearn more about slurry disposal
03Systems
How our systems work.
Each system as we build and install it. Select one to see its stages, specification and references.
FIG. 03.1Dense phase fly ash conveyingDense phase conveying vessel below a hopper, with its conveying air line, and more vessels in a row behind.Learn more about dense phase fly ash conveying
FIG. 03.2Bottom ash handlingSubmerged scraper chain conveyor for bottom ash in a workshop bay, with its inclined section and drive.Learn more about bottom ash handling
FIG. 03.3Ash slurry disposalAsh water recovery clarifier with its walkway bridge, part of an ash slurry disposal system.Learn more about ash slurry disposal
FIG. 03.4Dome ValveDome Valve half-section with the inflatable seal around its seat.Learn more about dome valve
FIG. 03.5Coal handling plantBucket wheel stacker-reclaimer at a coal stockyard.Learn more about coal handling plant
FIG. 03.6Waste to green coalWaste-to-green-coal line from tipping floor and sorting hall to the torrefaction reactor, pellet press and silo.Learn more about waste to green coal
04Industries
Serving India's core industries.
Material handling engineered for the plants that build the country.
05Legacy
A journey that began in 1918.
From the family's contracting firm of 1918 to Macawber Beekay, established in 1986, in 5 chapters.
Chapter 01 / 05
1918
A contractor's word
Seth Bakhtawar Singh begins building rest houses, station buildings, staff quarters, roads and bridges, among them the Chakki River Bridge in Punjab, as Bakhtawar Singh and Desraj Contractors.

FIG. 05.1 Etching of a railway station and a steel truss bridge over a river Chapter 02 / 05
Two decades on
Building for industry
About two decades later, with Seth Balkrishan, the firm turns to industrial buildings, residential colonies and water intake pump houses as Bakhtawar Singh Balkrishan & Co.

FIG. 05.2 Etching of a brick pump house on a river, with a chimney and a row of houses Chapter 03 / 05
1968
Into ash handling
The family firm diversifies into ash handling systems for thermal power plants, and various prestigious projects are executed.

FIG. 05.3 Etching of a thermal power plant with a chimney, a cooling tower and pipelines on trestles Chapter 04 / 05
1986
Macawber Beekay is established
Macawber Beekay Pvt. Ltd. is established through a joint venture agreement between Bakhtawar Singh Balkrishan & Co. and Simon-Macawber Ltd. of the UK, to pioneer dense phase pneumatic conveying in India.

FIG. 05.4 Etching of a dense phase conveying vessel with a valve on its inlet Chapter 05 / 05
Today
Fully Indian-owned, still building
Projects for power plants up to 1000 MW, our own works at Keshwana and Kasna, and a new chapter in waste to green coal and green hydrogen.

FIG. 05.5 Etching of an industrial plant with silos and conveyor galleries, and solar panels in the foreground
06Green transition
Waste to green coal.
Municipal solid waste, converted into a carbon-neutral fuel at up to 600 tonnes a day. The same engineering now builds electrolyzer and green hydrogen plants.
Capacity600 T/dayGreen Coal waste conversion capacity
07Aftermarket
Spare parts and aftermarket support.
A dedicated aftermarket services team supports plants from quotation to complete supply-chain management of spare parts.

FIG. 07.1 Conveyor idler rollers stocked as spare parts 
FIG. 07.2 Cast flanged pipe bends supplied as spare parts 
FIG. 07.3 Valves with pneumatic actuators supplied as spare parts
08References
- CS-01
Coal Mill Rejects Handling System for PF Boilers - CS-02
Bottom Ash (Jet Pump) and Fly Ash (Vacuum and Positive Pressure) Handling System for PF Boilers - CS-03
Bottom Ash (SSCC) and Fly Ash (Dense Phase) Handling System for PF Boilers - CS-04
Bed Ash, Fly Ash and Bed Material Handling System for CFBC Boilers
08.1 Trusted across India's power and core industries.
See all clientsAdaniDiversified groups and other organisations
Hyundai Engineering Co., Ltd.EPC contractors and equipment manufacturers
NTPCNational Thermal Power Corporation Ltd.Power generation utilities
Reliance Industries LimitedDiversified groups and other organisations
VedantaMetals: steel and aluminium
Aditya Birla GroupDiversified groups and other organisationsTata Projects LimitedEPC contractors and equipment manufacturers
Larsen & ToubroEPC contractors and equipment manufacturers
JSWJindal South WestMetals: steel and aluminium
GMR InfrastructureEPC contractors and equipment manufacturers
BHELBharat Heavy Electricals LimitedEPC contractors and equipment manufacturers
Jindal Steel & PowerMetals: steel and aluminium
Jaypee GroupJaiprakash Power Ventures LimitedPower generation utilities
Birla Corporation LimitedCement
AdhunikDiversified groups and other organisationsAdaniDiversified groups and other organisations
DaelimEPC contractors and equipment manufacturers
Mitsubishi Hitachi Power SystemsEPC contractors and equipment manufacturers
Petrovietnam LP1PPDiversified groups and other organisations
LILAMA 10, JSCEPC contractors and equipment manufacturers
NARIMENational Research Institute of Mechanical EngineeringDiversified groups and other organisationsHyundai Engineering Co., Ltd.EPC contractors and equipment manufacturers
BALCOBharat Aluminium Company Ltd.Metals: steel and aluminium
AryanCoal.ComDiversified groups and other organisations
RRVUNRajasthan Rajya Vidyut Utpadan NigamPower generation utilitiesNTPCNational Thermal Power Corporation Ltd.Power generation utilities
DVCDamodar Valley CorporationPower generation utilities
AlstomEPC contractors and equipment manufacturers
Torrent PowerPower generation utilities
CSEBChhattisgarh State Electricity BoardPower generation utilities
ISGECIsgec Heavy Engineering Ltd.EPC contractors and equipment manufacturers
ThermaxEPC contractors and equipment manufacturersReliance Industries LimitedDiversified groups and other organisations
WBPDCLThe West Bengal Power Development Corporation LimitedPower generation utilitiesVedantaMetals: steel and aluminium
Aditya Birla GroupDiversified groups and other organisations
UPRVUNLUttar Pradesh Rajya Vidyut Utpadan Nigam LimitedPower generation utilitiesTata Projects LimitedEPC contractors and equipment manufacturers
Tata SteelMetals: steel and aluminium
Tata PowerPower generation utilities
MAHAGENCOMaharashtra State Power Generation Co. Ltd.Power generation utilities
LancoLanco InfratechEPC contractors and equipment manufacturersLarsen & ToubroEPC contractors and equipment manufacturers
LafargeCement
KPCLKarnataka Power Corporation Ltd.Power generation utilitiesJaypee GroupJaiprakash Power Ventures LimitedPower generation utilities
Jindal Steel & PowerMetals: steel and aluminium
JSWJindal South WestMetals: steel and aluminium
IndiabullsDiversified groups and other organisations
HindalcoAditya Birla GroupMetals: steel and aluminium
HPGCLHaryana Power Generation Corporation Ltd.Power generation utilitiesGMR InfrastructureEPC contractors and equipment manufacturers
GSECLGujarat State Electricity Corp. Ltd.Power generation utilities
GrasimAditya Birla GroupCement
Essar ProjectsEPC contractors and equipment manufacturers
DoosanEPC contractors and equipment manufacturers
C&O GroupDiversified groups and other organisations
CESC LimitedPower generation utilities
Chettinad CementCement
Birla Corporation LimitedCementBHELBharat Heavy Electricals LimitedEPC contractors and equipment manufacturers
BGR EnergyEPC contractors and equipment manufacturers
ACC LimitedCement
APGENCOAndhra Pradesh Power Generation CorporationPower generation utilities
09Credentials
Recognised, and on record.
D-02Our brochuresCorporate brochures, the spare parts brochure and the Dome Valve catalogue, ready to download.Downloads
09.1 Company particulars
- Legal name
- Macawber Beekay Private LimitedMCA annual return (Form MGT-7), FY 2023-24, 27 Nov 2024
- CIN
- U29292UP2012PTC069644MCA annual return (Form MGT-7), FY 2023-24, 27 Nov 2024
- Ownership
- 100% Indian-owned; a wholly owned subsidiary of BSBK Engineers Private LimitedMCA annual return (Form MGT-7), FY 2024-25, 16 Oct 2025
- Head office
- Beekay House, C-450-451, Sector 10, Noida, Uttar Pradesh 201301MCA annual return (Form MGT-7), FY 2024-25, 16 Oct 2025
- Works
- RIICO Industrial Area, Keshwana, Kotputli, District Jaipur, RajasthanBSI certificate FM 56479 (ISO 9001:2015), 10 Oct 2024
- Turnover
- ₹1,070.53 crore (FY 2024-25), up from ₹877.85 crore (FY 2023-24) and ₹501.12 crore (FY 2022-23)MCA annual return (Form MGT-7), FY 2024-25, 16 Oct 2025
- Net worth
- ₹407.63 crore at 31 March 2025MCA annual return (Form MGT-7), FY 2024-25, 16 Oct 2025
09.2 Certifications and recognition, by date
- R-01Oct 2000
ISO 9001 quality management, certified by BSI with original registration on 24 October 2000 (FM 56479, valid to October 2027).
- R-02Nov 2009
ISO 14001 environmental management, certified by BSI since 10 November 2009 (EMS 555231, valid to October 2027).
SourceBSI certificate EMS 555231 (ISO 14001:2015), 10 Oct 2024
- R-03Feb 2015
Occupational health and safety certified to BS OHSAS 18001, moving to ISO 45001:2018 with BSI in January 2021 (OHS 608844).
SourceBSI certificate OHS 608844 (ISO 45001:2018), 19 Jan 2021
- R-042019
Named “Best Quality Conscious Subcontractor” by Tata Projects for the 1 × 800 MW Stage II balance of plant at Krishnapatnam.
- R-052020
At GSECL Ukai, Unit 6, teams worked 19 and 20 hours straight to clear bottom ash evacuation problems while the unit kept generating.
- R-062021
GSECL Ukai recognised Macawber Beekay for developing a safety culture on Ash Handling Plant 6.
- R-07Mar 2022
Macawber Beekay Pvt Ltd, Jaipur received a Government of Rajasthan State Safety Award 2022 certificate for its participation in the Rajasthan Factory Safety Award Scheme, 2022.
SourceGovernment of Rajasthan, State Safety Award 2022 certificate, 4 Mar 2022
- R-08Nov 2023
The Keshwana works approved by LRQA to ISO 3834-2:2021, the comprehensive level for fusion welding, valid to November 2028.
SourceLRQA certificate PRJ11100409564/1 (ISO 3834-2:2021), 20 Nov 2023
10People
Life at Macawber Beekay.
A platform for every individual to perform at their peak and grow into senior roles.
11Knowledge
Articles from Macawber Beekay.
46 articles on ash handling, coal handling and green coal.
12Enquiry
Talk to our engineers.
Planning a new plant or upgrading one? Our engineering team in Noida is ready to help.













