Green coal infrastructure
Macawber Beekay's green coal work rests on the infrastructure of an engineering company established in 1986, with group roots in 1918: headquarters in Noida, Uttar Pradesh, near New Delhi, and a manufacturing unit at Keshwana, Rajasthan, equipped for manufacturing, painting and testing.

The same base that has delivered ash handling systems for solid fuel-fired boilers of up to 1000 MW now designs and builds plants that convert municipal solid waste into green coal.
Infrastructure capabilities
Macawber Beekay is a dedicated and efficient group that provides ash handling solutions across the power industry for solid fuel-fired boilers of up to 1000 MW. The headquarters is in Noida, Uttar Pradesh, near New Delhi. The manufacturing unit at Keshwana, Rajasthan, is fully equipped with manufacturing, painting and testing facilities.
| Figure | Value |
|---|---|
| Established | 1986 |
| Worldwide clients | 100+ |
| Experienced workers | 1500+ |
| Working installations | 1500+ |
Built for the green coal plant
Green coal technology aims to reduce harm to the environment through a variety of cleaning and emission-controlling technologies. A waste-to-coal plant brings together waste receiving and feeding, shredding, the torrefaction reactor with its auxiliaries, and a pellet line with sieve, mixer, pelletiser, dryer and silo. The green coal process and technology page sets out each stage.
The same capabilities, on site: building the Bhopal waste-to-coal plant for NTPC Vidyut Vyapar Nigam Limited, with Macawber Beekay as EPC partner.
Building the Bhopal waste-to-coal plant
Bhopal Harit Koyla Pariyojana for NTPC Vidyut Vyapar Nigam Limited, with Macawber Beekay as EPC partner: fabrication, erection and the site team. Plant capacity: 400 tonnes.
A turnkey provider to the power industry
Macawber Beekay provides complete turnkey solutions to the power industry. Its green coal is carbon neutral, derived from municipal solid waste without any mining of fossil fuels, and offers industries a fuel that replaces fossil coal. The company's history and values are described on the about us page.
At a glance
Worldwide
Experienced
Installations
Star
Last reviewed
Infrastructure
| Established | 1986 |
|---|---|
| Headquarters | Noida, Uttar Pradesh, near New Delhi |
| Manufacturing unit | Keshwana, Rajasthan |
| Works facilities | Manufacturing, painting and testing |
| Boiler experience | Solid fuel-fired boilers up to 1000 MW |
| Working installations | 1500+ |
| Experienced workers | 1500+ |
| Worldwide clients | 100+ |
Talk to our engineers
Our team in Noida answers enquiries on infrastructure.
Get in touch+91 120 450 7700At the plant
Questions buyers ask
Where does Macawber Beekay manufacture its equipment?
Macawber Beekay's manufacturing unit is at Keshwana in Rajasthan, fully equipped with manufacturing, painting and testing facilities. The company also has works at Kasna, Greater Noida, Uttar Pradesh. Its headquarters are in Noida, Uttar Pradesh, near New Delhi.
What experience does Macawber Beekay bring to green coal projects?
Macawber Beekay was established in 1986 (its family business began in 1918) and specialises in ash handling solutions for solid fuel-fired boilers of up to 1000 MW. It has more than 1500 working installations, more than 1500 experienced workers and over 100 clients worldwide.
Why is green coal described as carbon neutral?
Bio-coal is carbon neutral because it is derived from municipal solid waste without any mining of fossil fuels. Using 1 kg of bio-coal as solid fuel in place of fossil coal reduces CO2 by approximately 2 kg, according to Macawber Beekay's green coal material.
Continue reading.
Green coalWaste to green coal: Macawber Beekay turns municipal solid waste into carbon-neutral green coal by torrefaction, with capacity of up to 600 T/day of waste.
Process and technologyHow a waste-to-coal plant works: municipal solid waste is segregated, torrefied in an oxygen-deficient reactor, and the charcoal pelletised into green coal.
About usMacawber Beekay is a fully Indian-owned EPC company for ash, coal and bulk material handling, established in 1986, with group roots in 1918, and works at Keshwana and Kasna.
Electrolyzer and green hydrogenMacawber Beekay manufactures electrolyzers that split water into hydrogen and oxygen using renewable power, producing green hydrogen for industrial use.
Talk to our engineers.
Planning an infrastructure project, or upgrading one? Our engineering team in Noida is ready to help.