Case Study: Bottom Ash (Jet Pump) and Fly Ash (Vacuum and Positive Pressure) Handling System for PF Boilers
Jet pump bottom ash and vacuum plus pressure fly ash handling, with ash water recovery, supplied for BHEL at the 2 x 520 MW Vizag thermal power plant.

Project Synopsis
| Name of the Client / Purchaser | M/s BHEL-ISG, Bangalore |
| Location of the Plant / project | 2×520 MW (1040 MW) VIZAG TPP |
| Type of the Boiler / Make | PF fired / BHEL |
| Brief Scope of Work | Design, Engg., Manufacturing, Supply of AHP & AWRS System |
Type of System
| PRIMARY SYSTEM | Bottom Ash Handling System | Bottom Ash Hopperwith Clinker Grinder, Jet Pump, slurry sump and lean slurry disposal System to ash pond through Ash Slurry Pumps |
| PRIMARY SYSTEM | Fly Ash Handling System | Vacuum type Conveying system, using vacuum pumps and Bag Filters. |
| SECONDARY SYSTEM | Fly Ash Handling System | Positive Pressure type Pneumatic Conveying system, using Screw Type conveying air compressors. |
| Silos Unloading System | Unloading dry fly ash through Unloading Spout and wet conditioned ash through Ash Conditioners |
Bottom Ash Handling System ( Jet Pump System ):
Macawber Beekay successfully installed lean slurry conveying system using combination of Jet pumps or jet pump system, Ash Slurry Pumps along with HP / LP water Pumps and ash conveying pipes.
Furnace (bottom) ash is collected for each unit, via a refractory lined steel construction bottom ash hopper installed below furnace. The furnace seal plate dips into seal trough filled with water around top periphery of bottom ash hopper for the sealing of furnace. The necessary clearance is provided between seal plate and seal trough bottom to take care of expansion of furnace.
Spray nozzles are provided in the bottom ash hopper for quenching of ash and seal trough flushing pipe and cleaning of inspection window. Economizer ash also flows into respective Bottom Ash Hopper for further disposal.
The Ash is Collected in bottom ash slurry sump, this ash in Slurry Sump is further disposed to slurry pond using Ash Slurry Pumps.
HP and LP water pumps are provided to meet the water requirement of the system.
Ash water recovery system is provided to collect and pump back clear water from ash pond.
Fly Ash Handling System:
System consists of combination of Vacuum fly ash collection from ESP hoppers into Intermediate Surge (buffer) Hoppers and Positive Pressure Pneumatic Conveying System for transfer of fly ash to main silos, provided near boundary wall of the power plant.
Brief write-up for System at ESP:
There are eight fields in ESP with four passes. Each pass shall have 32 Hoppers.
Beneath each ESP hopper, an Ash Intake Valve (Dome Valve) & Unloading T along with necessary Instruments and Fluidizing Padshas been provided.Each Row is connected in series with Single pipe for each Pass. That means there is one fly ash conveying pipeline for one Pass of ESP. Total 4 sets of fly ash conveying pipes have been provided for handling ESP ash for each boiler.
The Ash from ESP is either conveyed to Collector Tank OR to Three Cell Ash Collection Bag Filters. Suitable Vacuum Pumps are used to create vacuum in conveying pipes below ESP, which helps in the evacuation of material from ESP.
The Ash coming from ESP in Collector Tanks is mixed with water using wetting head above ash collector tank. This provision is provided to handle fly ash in slurry form to Ash Slurry Sump for further disposal using conveying pipes.
In the other route, Fly Ash below Bag Filter Hopper is collected in Suitable Buffer Hopper and conveyed to FA Silos using compressed Air and Ash Conveying Vessels with Conveying Pipeline. 2 sets of Conveying Pipelines is provided for each Boiler.Conveying air requirement for both the units is met from a common bank of CA compressors. Separate Instrument Air compressors have also been provided dedicated to fly ash handling system.
System at Fly Ash Silo:
Total of 2 sets of fly ash silos have been provided for collection of fly ash from two boilers.
At conical portion of fly ash silos, Fluidizing pads have been provided.3 Nos. (2W+1S) Roots Blower and 3 Nos. heaters are provided for fluidization of set of two fly ash silos.
The FA Silo 1 & Silo 2 have three outlet points. First and second outlet point are provided with fly ash unloading spouts for unloading of fly ash into closed tankers. The third outlet is provided with ash conditioners for moist fly ash disposal into open trucks, the fourth outlet is provided with just isolation valve for any emergency unloading of fly ash.
Questions this answers
How is the fly ash system arranged at the Vizag plant?
Each boiler's ESP has eight fields in four passes of 32 hoppers, each with a Dome Valve as ash intake valve. Vacuum pumps draw ash along one pipeline per pass to collector tanks, for wet disposal as slurry, or to three-cell bag filters. From buffer hoppers below the bag filters, ash conveying vessels move it by compressed air through two pipelines per boiler to the fly ash silos.
Systems discussed
- Bottom ash handlingBottom ash handling systems for PF and CFBC boilers: jet pump, submerged scraper chain conveyor (SSCC), dry and dense phase systems by Macawber Beekay.
- Fly ash handlingFly ash handling systems that convey dry fly ash from ESP, APH and economiser hoppers to silos by dense phase pressure or vacuum conveying, with Dome Valves.
- Ash slurry disposalAsh slurry disposal systems: lean slurry with ash water recovery, and high concentration slurry disposal (HCSD) at about 60% concentration, up to 17 km.
More from our engineers
- Coal Handling System for Power Plants: Macawber Beekay's EPC ExpertiseHow a power plant coal handling system works, from wagon tippler or track hopper unloading through crushing, stacking and reclaiming to bunker feeding.
- Different Types of Bottom Ash Handling Systems ExplainedWet jet pumping, semi-dry submerged scraper chain conveyor (SSCC), dry mechanical and dense phase pneumatic bottom ash handling compared on water use and fit.
- Pneumatic Ash Handling System for CFBC Boilers: How It Handles Bed Ash and Fly AshWhy dense phase pneumatic conveying suits CFBC and AFBC bed ash and fly ash, the key design points, and the 2 x 300 TPH CFBC boiler project at HMEL Bhatinda.
Talk to our engineers.
Planning a new plant or upgrading one? Our engineering team in Noida is ready to help.