Ash handling project references for NTPC and state power utilities
Explore ash handling projects commissioned or under execution by Macawber Beekay for NTPC and state power utilities.

These references cover fly ash handling, bottom ash handling and slurry disposal systems, with project configuration, system capacities, and commissioning dates or execution status.
- 67projects listed
- 55commissioned
- 12under execution
- 24utilities and owners
- 800 MWlargest unit size
- 1999earliest commissioning listed
Register Project references
Each row is one project. Filter by owner, status, scope or unit size, or search for a plant, utility, state or EPC contractor. Select a row to see the fly ash, bottom ash and slurry disposal specifications.
In progressLara STPP, Stage II
Fly ash system
- System
- Dense phase pressure conveying to the fly ash classification system (Stage I), then to the fine and main fly ash silos (Stage II)
- Capacity
- Stage I: 319 TPH per unit (6 + 2 lines)Stage II: coarse ash 105 TPH per stream (3 working, 2 standby per unit); fine ash 152.5 TPH (1 working, 1 standby, both units)
- Conveying distance
- Stage I: 315 mStage II: 1,128 m
Bottom ash system
- System
- Water-impounded bottom ash hopper, jet pumps and slurry pumps to dewatering bins
- Capacity
- 3 × 93 TPH
Slurry disposal and HCSD
- System
- Lean slurry disposal, bottom ash
- Capacity
- 3 streams, 1,115 m³/h per unit (1 working, 2 standby)
- Pumping distance
- 1,334 m
- System
- High concentration slurry disposal (HCSD), fly ash
- Capacity
- 6 × 133 TPH for both units (4 working, 2 standby)
- Pumping distance
- 6,500 m, 25.6 m static head
- Owner
- NTPC Limited
- Executed through
- BHEL-ISG, Bengaluru
- Current status
- Supplies 41%Erection 17%
In progressUkai Supercritical TPP
Fly ash system
- System
- Single-stage dense phase pneumatic pressure conveying, ESP hoppers to main and intermediate silos
- Capacity
- 326 TPH
- Conveying distance
- 436 m
Bottom ash system
- System
- Water-impounded bottom ash hopper, jet pumps and slurry pumps
- Capacity
- 3 × 82 TPH
Slurry disposal and HCSD
- System
- Lean slurry disposal, bottom ash (to ash dyke, or dewatering bins for truck disposal)
- Pumping distance
- 3,000 m
- System
- High concentration slurry disposal (HCSD), fly ash
- Capacity
- 2 × 142 TPH
- Pumping distance
- 3,000 m
- Owner
- Gujarat State Electricity Corporation Ltd.
- Executed through
- Dineshchandra R. Agrawal Infracon, Gurugram
- Current status
- Under engineering
In progressSingareni Thermal Power Project Extension
Fly ash system
- System
- Dense phase pressure conveying to the intermediate and HCSD silos (Stage I), then to the main fly ash silos (Stage II)
- Capacity
- Stage I: 319 TPH per unit (6 + 2 lines)Stage II: 6 streams of 107 TPH per unit (3 working, 3 standby)
- Conveying distance
- Stage I: 710 mStage II: 1,550 m
Bottom ash system
- System
- Water-impounded bottom ash hopper, jet pumps and slurry pumps to dewatering bins or ash dyke
- Capacity
- 3 × 93 TPH
Slurry disposal and HCSD
- System
- Lean slurry disposal, bottom ash
- Capacity
- 3 streams, 1,185 m³/h per unit (1 working, 2 standby)
- Pumping distance
- 4,000 m, 10 m static head
- System
- High concentration slurry disposal (HCSD), fly ash
- Capacity
- 4 × 140 TPH (2 working, 2 standby)
- Pumping distance
- 4,500 m, 30 m static head
- Owner
- The Singareni Collieries Company Ltd.
- Executed through
- Power Mech Projects, Hyderabad
- Current status
- Under engineering
In progressDeen Bandhu Chhotu Ram TPP, Yamuna Nagar
Fly ash system
- System
- Vacuum extraction with pressure conveying
- Capacity
- Vacuum: 6 × 57.5 TPHPressure: 3 × 115 TPH
- Conveying distance
- 415 m
Bottom ash system
- System
- Water-impounded bottom ash hopper, jet pumps and slurry pumps
- Capacity
- 3 × 94 TPH
Slurry disposal and HCSD
- System
- Lean slurry disposal, bottom ash and fly ash
- Capacity
- 1,050 m³/h
- Pumping distance
- 8,000 m, 15 m static head
- Owner
- Haryana Power Generation Corporation Ltd.
- Executed through
- BHEL (PSNR), Noida
- Current status
- Under design and engineeringCivil works 5%
In progressUdangudi Super Thermal Power Plant, Stage I
Fly ash system
- System
- Vacuum extraction (Stage I), then dense phase pressure conveying (Stage II)
- Capacity
- Stage I: 95 TPH per unitStage II: 2 × 75 TPH
- Conveying distance
- Stage I: 500 mStage II: 1,250 m
Bottom ash system
- System
- Submerged scraper chain conveyor with jet pumps
- Capacity
- 2 × 20 TPH
- Owner
- Tamil Nadu Generation and Distribution Corporation Ltd.
- Executed through
- BHEL-ISG, Bengaluru
- Current status
- Supplies 99.5%Erection 80%
In progressBuxar Thermal Power Project
Fly ash system
- System
- Vacuum extraction (Stage I), then dense phase pressure conveying (Stage II)
- Capacity
- Stage I: 6 × 60 TPH per unitStage II: 3 × 120 TPH
- Conveying distance
- Stage I: 100 mStage II: 1,750 m
Bottom ash system
- System
- Water-impounded bottom ash hopper and jet pumps
- Capacity
- 3 × 73.66 TPH per unit
- Owner
- SJVN Thermal Pvt. Ltd.
- Executed through
- Larsen & Toubro, Vadodara
- Current status
- Supplies completeErection: Unit 1 and common systems complete, Unit 2 30%
In progressSagardighi Thermal Power Station
Fly ash system
- System
- Vacuum extraction (Stage I), then dense phase pressure conveying (Stage II)
- Capacity
- Stage I: 8 × 56 TPH per unitStage II: 5 × 112 TPH
- Conveying distance
- Stage I: 117 mStage II: 740 m
Bottom ash system
- System
- Water-impounded bottom ash hopper, jet pumps and slurry pumps
- Capacity
- 3 × 98 TPH
Slurry disposal and HCSD
- System
- Lean slurry disposal
- Capacity
- 1,270 m³/h at 29 MWC
- Pumping distance
- 3,750 m
- Owner
- West Bengal Power Development Corporation Ltd.
- Executed through
- BHEL-ISG, Bengaluru
- Current status
- Supplies 100%Erection 98%
In progressTalcher TPP, Stage III (bottom ash and slurry package)
Bottom ash system
- System
- Water-impounded bottom ash hopper, jet pumps and slurry pumps
- Capacity
- 3 × 90 TPH
- Owner
- NTPC Limited
- Executed through
- BHEL-ISG, Bengaluru
- Current status
- Supplies 87%Under erection
- Note
- Ordered by BHEL for NTPC's plant
In progressKoradi TPP
Fly ash system
- System
- Single-stage dense phase pneumatic pressure conveying
- Capacity
- 201.6 TPH
- Conveying distance
- 950 m
Bottom ash system
- System
- Water-impounded bottom ash hopper, jet pumps and slurry pumps
- Capacity
- 3 × 96 TPH
Slurry disposal and HCSD
- System
- Lean slurry disposal, bottom ash
- Capacity
- 3 streams, 1,130 m³/h per unit (2 working, 1 standby)
- Pumping distance
- 3,500 m
- System
- Coarse ash slurry pumps
- Capacity
- 884 m³/h (1 working, 1 standby)
- Pumping distance
- 260 m
- System
- Fly ash slurry pumps
- Capacity
- 850 m³/h (1 working, 1 standby)
- Pumping distance
- 122 m
- System
- High concentration slurry disposal (HCSD)
- Capacity
- 236 m³/h at 60%, 210 m³/h at 65%, 188 m³/h at 70% concentration
- Pumping distance
- 3,500 m
- Owner
- Maharashtra State Power Generation Company Ltd.
- Executed through
- TKIL Industries, Pune
- Current status
- Under design and engineeringCivil works 5%
In progressKorba West
Fly ash system
- System
- Vacuum extraction with pressure conveying
- Capacity
- Vacuum: 6 × 42 TPHPressure: 3 × 84 TPH
- Conveying distance
- 925 m
Bottom ash system
- System
- Water-impounded bottom ash hopper, jet pumps and slurry pumps
- Capacity
- 3 × 84 TPH
Slurry disposal and HCSD
- System
- Lean slurry disposal, bottom ash (to ash dyke, or dewatering bins for truck disposal)
- Pumping distance
- 13,000 m
- System
- High concentration slurry disposal (HCSD), fly ash
- Capacity
- 6 × 115 TPH
- Pumping distance
- 13,000 m
- Owner
- Chhattisgarh State Power Generation Company Ltd.
- Executed through
- BHEL (PSNR), Noida
- Current status
- Under design and engineering
In progressTalcher STPS, Stage II (ash slurry disposal to mine)
Mine void filling
- System
- Ash slurry disposal to mine voids, with ash water recovery (AWRS)
- Capacity
- 1,270 m³/h
- Pumping distance
- 1,100 m
- Owner
- NTPC Limited
- Current status
- Supplies 80%Under erection
In progressRihand Super Thermal Power Project, Stage I
Fly ash system
- System
- Vacuum extraction (Stage I), then dense phase pressure conveying (Stage II)
- Capacity
- Stage I: 4 × 60 TPH per unitStage II: 2 × 120 TPH
- Conveying distance
- Stage I: 40 mStage II: 900 m
- Owner
- NTPC Limited
- Current status
- Supplies 100%Erection 60%Civil works 72%
2025North Karanpura TPS
Fly ash system
- System
- Vacuum extraction (Stage I), then dense phase pressure conveying (Stage II)
- Capacity
- Stage I: 6 × 55.8 TPH per unitStage II: 3 × 111.6 TPH
- Conveying distance
- Stage I: 80 mStage II: 900 m
Bottom ash system
- System
- Water-impounded bottom ash hopper, jet pumps and slurry pumps; bottom ash overflow (BAOF) slurry pumped to the dewatering bins or ash dyke
- Capacity
- 3 × 96 TPH
Slurry disposal and HCSD
- System
- Lean slurry disposal
- Capacity
- 1,039 m³/h at 45 MWC
- Pumping distance
- 3,000 m
- System
- High concentration slurry disposal (HCSD)
- Capacity
- 163 m³/h
- Pumping distance
- 5,000 m
- Owner
- NTPC Limited
- Executed through
- BHEL-ISG, Bengaluru
- Commissioning
- Unit 1: Feb 2023Unit 2: Feb 2024Unit 3: Jun 2025
2025Bhusawal TPS
Fly ash system
- System
- Two-stage dense phase pneumatic pressure conveying
- Capacity
- Stage I: 297 TPHStage II: 2 × 148 TPH
- Conveying distance
- Stage I: 250 mStage II: 650 m
Bottom ash system
- System
- Water-impounded bottom ash hopper, jet pumps and slurry pumps
- Capacity
- 3 × 90 TPH
Slurry disposal and HCSD
- System
- Lean slurry disposal, bottom ash
- Capacity
- 2 streams of 1,250 m³/h (1 working, 1 standby)
- System
- High concentration slurry disposal (HCSD), fly ash
- Capacity
- 2 × 193 TPH (1 working, 1 standby)
- Pumping distance
- 12,000 m, 72.5 m static head
- Owner
- Maharashtra State Power Generation Company Ltd.
- Executed through
- BHEL-ISG, Bengaluru
- Commissioning
- Jan 2025
2024Wanakbori TPS
Fly ash system
- System
- Vacuum extraction (Stage I), then dense phase pressure conveying (Stage II)
- Capacity
- Stage I: 6 × 60 TPHStage II: 4 streams of 116 TPH per unit (3 working, 1 standby)
- Conveying distance
- Stage I: 70 mStage II: about 1,000 m
Bottom ash system
- System
- Water-impounded bottom ash hopper, jet pumps and slurry pumps
- Capacity
- 3 × 75 TPH
Slurry disposal and HCSD
- System
- Lean slurry disposal, bottom ash
- Capacity
- 2 streams of 890 m³/h (1 working, 1 standby)
- Pumping distance
- 3,000 m, 15 m static head
- System
- High concentration slurry disposal (HCSD), fly ash
- Capacity
- 2 × 200 TPH (1 working, 1 standby)
- Pumping distance
- 1,300 m, 15 m static head
- Owner
- Gujarat State Electricity Corporation Ltd.
- Executed through
- BHEL-ISG, Bengaluru
- Commissioning
- Unit 1: Mar 2023Unit 2: Feb 2024
2024Telangana Super Thermal Power Project, Karimnagar
Fly ash system
- System
- Two-stage dense phase pneumatic pressure conveying
- Capacity
- Stage I: 363 TPHStage II: 6 streams of 112.43 TPH per unit (3 working, 3 standby)
- Conveying distance
- Stage I: 130 mStage II: 1,150 m
Bottom ash system
- System
- Water-impounded bottom ash hopper, jet pumps and slurry pumps
- Capacity
- 3 × 109 TPH
Slurry disposal and HCSD
- System
- Lean slurry disposal, bottom ash
- Capacity
- 3 streams, 1,510 m³/h for both units (1 working, 2 standby)
- Pumping distance
- 7,500 m, 30 m static head
- System
- High concentration slurry disposal (HCSD), fly ash
- Capacity
- 6 × 129 TPH for both units (4 working, 2 standby)
- Pumping distance
- 11,000 m, 30 m static head
- Owner
- NTPC Limited
- Executed through
- BHEL-ISG, Bengaluru
- Commissioning
- Unit 1: Mar 2023Unit 2: Feb 2024
2023Maitree Super Thermal Power Project, Rampal
Fly ash system
- System
- Pressure conveying in three stages, including ship loading from the main silos
- Capacity
- Stage I: 95 TPH per unitStage II: 2 × 75 TPH per unit (1 working, 1 standby)Stage III: 300 TPH common to both units, ship loading
- Conveying distance
- Stage I: up to 500 mStage II: 1,250 mStage III: 200 m
Bottom ash system
- System
- Pressure conveying from the bottom ash main silo to ship loading
- Capacity
- 2 × 300 TPH common to both units (1 working, 1 standby), 150 m
Slurry disposal and HCSD
- System
- Ash slurry disposal, bottom ash and fly ash
- Capacity
- 3 × 60 TPH dry ash basis, common to both units (2 working, 1 standby)
- Pumping distance
- 2,500 m
- Owner
- Bangladesh-India Friendship Power Company (Pvt.) Ltd.
- Executed through
- BHEL-ISG, Bengaluru
- Commissioning
- Unit 1: Oct 2022Unit 2: Dec 2023
2023Rihand Super Thermal Power Project, Stage III
Fly ash system
- System
- Dense phase pressure conveying (Stage II)
- Capacity
- 3 × 102 TPH per unit (2 working, 1 standby)
- Conveying distance
- 1,110 m
- Owner
- NTPC Limited
- Commissioning
- Dec 2023
2023Rourkela PP-II Expansion Project
Fly ash system
- System
- Two-stage dense phase pneumatic pressure conveying
- Capacity
- Stage I: 97 TPHStage II: 2 × 97 TPH (1 working, 1 standby)
- Conveying distance
- Stage I: 300 mStage II: about 1,150 m
Bottom ash system
- System
- Water-impounded bottom ash hopper, jet pumps and slurry pumps
- Capacity
- 2 × 65 TPH
Slurry disposal and HCSD
- System
- Lean slurry disposal, bottom ash
- Capacity
- 3 streams of 630 m³/h (1 working, 1 standby, 1 maintenance standby), 2 pipelines
- Pumping distance
- 6,000 m, 39.5 m static head
- System
- High concentration slurry disposal (HCSD), fly ash
- Capacity
- 2 × 90 TPH (1 working, 1 standby)
- Pumping distance
- 6,000 m, 39.5 m static head
- Owner
- NTPC-SAIL Power Company Ltd.
- Executed through
- BHEL-ISG, Bengaluru
- Commissioning
- Mar 2023
2022Sri Damodaram Sanjeevaiah TPS, Krishnapatnam
Fly ash system
- System
- Vacuum extraction (Stage I), then dense phase pressure conveying (Stage II); dense phase also for Stage III
- Capacity
- Stage I: 8 × 40 TPHStage II: 5 streams of 80 TPH (4 working, 1 standby)
- Conveying distance
- Stage I: 80 mStage II: 480 m
Bottom ash system
- System
- Water-impounded bottom ash hopper, jet pumps, dewatering bins (Hydrobins) and slurry pumps
- Capacity
- 3 × 75 TPH
Slurry disposal and HCSD
- System
- Lean slurry disposal, bottom ash
- Capacity
- 3 streams of 980 m³/h (1 working, 1 standby, 1 maintenance standby)
- Pumping distance
- 6,250 m, 21 m static head
- System
- High concentration slurry disposal (HCSD), fly ash
- Capacity
- 2 × 140 TPH (1 working, 1 standby)
- Pumping distance
- 6,250 m, 40 m static head
- Owner
- Andhra Pradesh Power Development Company Ltd.
- Executed through
- Tata Power, Hyderabad
- Commissioning
- Mar 2022
2021Sipat STPP, Stage I (augmentation of dry fly ash transportation, Units 2 & 3)
Fly ash system
- System
- Dense phase pneumatic pressure conveying
- Capacity
- 288 TPH per unit: 4 streams of 96 TPH (3 working, 1 standby)
- Conveying distance
- 935 m
- Owner
- NTPC Limited
- Commissioning
- Aug 2021
2017Yermarus Thermal Power Station, Raichur
Fly ash system
- System
- Vacuum extraction (Stage I), then dense phase pressure conveying (Stage II)
- Capacity
- Stage I: 6 × 66 TPH per unitStage II: 3 × 132 TPH
- Conveying distance
- Stage I: 70 mStage II: 850 m
Bottom ash system
- System
- Water-impounded bottom ash hopper, jet pumps and slurry pumps; bottom ash overflow (BAOF) slurry pumped to the ash dyke
- Capacity
- 3 × 77 TPH
Slurry disposal and HCSD
- System
- Lean slurry disposal
- Capacity
- 6 × 755 m³/h at 45.37 MWC
- Pumping distance
- 16,000 m
- Owner
- Raichur Power Corporation Ltd.
- Executed through
- BHEL-ISG, Bengaluru
- Commissioning
- Unit 1: Oct 2016Unit 2: Mar 2017
2017Bokaro A TPS
Fly ash system
- System
- Vacuum extraction by mechanical exhauster (Stage I), then dense phase pressure conveying (Stage II)
- Capacity
- Stage I: 4 × 60 TPHStage II: 2 × 120 TPH
- Conveying distance
- 750 m
Bottom ash system
- System
- Water-impounded bottom ash hopper, jet pumps and slurry pumps
- Capacity
- 2 × 75 TPH
Slurry disposal and HCSD
- System
- Lean slurry disposal
- Capacity
- 720 to 775 m³/h at 18 to 20 MWC
- Pumping distance
- 3 × 750 m
- Owner
- Damodar Valley Corporation
- Executed through
- BHEL-ISG, Bengaluru
- Commissioning
- Jan 2017
2017Parli TPP
Fly ash system
- System
- Vacuum extraction (Stage I), then dense phase pressure conveying (Stage II)
- Capacity
- Stage I: 4 × 45 TPHStage II: 4 × 45 TPH
- Conveying distance
- Stage I: 100 mStage II: about 1,000 m
Bottom ash system
- System
- Water-impounded bottom ash hopper, jet pumps and slurry pumps
- Capacity
- 2 × 65 TPH
Slurry disposal and HCSD
- System
- Lean slurry disposal
- Capacity
- 650 m³/h at 50 MWC
- Pumping distance
- 2,500 m
- Owner
- Maharashtra State Power Generation Company Ltd.
- Executed through
- Sunil Hi-Tech Engineers, Nagpur
- Commissioning
- Mar 2017
2016Marwa Thermal Power Plant
Fly ash system
- System
- Vacuum extraction (Stage I), then dense phase pressure conveying (Stage II)
- Capacity
- Stage I: 4 × 60 TPHStage II: 2 × 120 TPH
- Conveying distance
- Stage I: 100 mStage II: about 1,000 m
Bottom ash system
- System
- Water-impounded bottom ash hopper, jet pumps and slurry pumps
- Capacity
- 2 × 75 TPH
Slurry disposal and HCSD
- System
- Lean slurry disposal
- Capacity
- 620 m³/h at 47 MWC
- Pumping distance
- 7,000 m
- System
- High concentration slurry disposal (HCSD)
- Capacity
- 175 m³/h
- Owner
- Chhattisgarh State Power Generation Company Ltd.
- Executed through
- BGR Energy Systems, Chennai
- Commissioning
- Unit 1: Feb to Mar 2016 (COD)Unit 2: Jul to Aug 2016
2016Anpara D TPS
Fly ash system
- System
- Single-stage dense phase pneumatic pressure conveying, with slurry disposal
- Capacity
- 2 × 230 TPH
- Conveying distance
- 600 m
Bottom ash system
- System
- Water-impounded bottom ash hopper, jet pumps and slurry pumps
- Capacity
- 2 × 82 TPH
Slurry disposal and HCSD
- System
- Lean slurry disposal
- Capacity
- 965 m³/h at 49 MWC
- Pumping distance
- 3 × 14,000 m
- System
- Ash water recovery system (AWRS)
- Capacity
- 1,350 m³/h at 130 MWC
- Owner
- Uttar Pradesh Rajya Vidyut Utpadan Nigam Ltd.
- Executed through
- BHEL-ISG, Bengaluru
- Commissioning
- Unit 6: May 2016Unit 7: Oct 2016
2016Chandrapur Expansion TPP
Fly ash system
- System
- Single-stage dense phase pneumatic pressure conveying, with slurry disposal
- Capacity
- 240 TPH
- Conveying distance
- 510 m
Bottom ash system
- System
- Water-impounded bottom ash hopper, jet pumps and slurry pumps
- Capacity
- 2 × 75 TPH
Slurry disposal and HCSD
- System
- Lean slurry disposal
- Capacity
- 975 m³/h at 47.5 MWC
- Pumping distance
- 2 × 15,000 m
- Owner
- Maharashtra State Power Generation Company Ltd.
- Executed through
- BGR Energy Systems, Chennai
- Commissioning
- Unit 8: Nov 2015Unit 9: Sep 2016
2015Vindhyachal Super Thermal Power Station, Stage V
Fly ash system
- System
- Vacuum extraction (Stage I), then dense phase pressure conveying (Stage II)
- Capacity
- Stage I: 4 × 48.67 TPHStage II: 2 × 97.33 TPH
- Conveying distance
- Stage I: 70 mStage II: about 1,050 m
Bottom ash system
- System
- Water-impounded bottom ash hopper, jet pumps and slurry pumps, with ash water recovery (AWRS)
- Capacity
- 2 × 61.5 TPH
Slurry disposal and HCSD
- System
- Lean slurry disposal
- Capacity
- 1,250 m³/h at 43.5 MWC
- Pumping distance
- 2 × 10,500 m
- Owner
- NTPC Limited
- Commissioning
- Sep 2015
2015Tuticorin TPP
Bottom ash system
- System
- Scraper chain conveyor
- Capacity
- 4 × 40 TPH
- Owner
- NLC Tamil Nadu Power Ltd.
- Executed through
- BHEL-ISG, Bengaluru
- Commissioning
- Unit 1: Mar 2015Unit 2: Jun 2015
2014Mouda Super Thermal Power Station
Fly ash system
- System
- Vacuum extraction (Stage I), then dense phase pressure conveying (Stage II)
- Capacity
- Stage I: 4 × 63.33 TPHStage II: 3 × 126.66 TPH
- Conveying distance
- Stage I: 70 mStage II: about 1,030 m
Bottom ash system
- System
- Water-impounded bottom ash hopper, jet pumps and slurry pumps
- Capacity
- 2 × 85 TPH
Slurry disposal and HCSD
- System
- Lean slurry disposal
- Capacity
- 872 m³/h at 45 MWC
- Pumping distance
- 3 × 4,000 m
- System
- High concentration slurry disposal (HCSD), bottom ash and fly ash
- Capacity
- 190 TPH
- Pumping distance
- 4,000 m
- Owner
- NTPC Limited
- Commissioning
- Dec 2014
2014Chhabra TPS
Fly ash system
- System
- Dense phase pneumatic pressure conveying
- Capacity
- Stage I: 60 TPHStage II: 100 TPH
- Conveying distance
- Stage I: 365 mStage II: 1,000 m per stream
- Owner
- Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
- Executed through
- Grasim Industries, Mumbai
- Commissioning
- Unit 3: Dec 2013Unit 4: Mar 2014
2014Korba West TPS (HTPS)
Fly ash system
- System
- Dense phase pneumatic pressure conveying
- Capacity
- 112 TPH per unit
- Conveying distance
- 600 to 850 m (Unit 1: 600 mUnit 2: 640 mUnit 3: 800 mUnit 4: 850 m)
Bottom ash system
- System
- Dewatering bins (Hydrobins) with sedimentation and settling tanks; bottom ash and fly ash then go to HCSD
Slurry disposal and HCSD
- System
- High concentration slurry disposal (HCSD)
- Capacity
- 175 m³/h
- Pumping distance
- 12,000 m
- Owner
- Chhattisgarh State Power Generation Company Ltd.
- Commissioning
- Fly ash: Units 1 & 2 May 2011, Unit 3 Aug 2011, Unit 4 Nov 2011HCSD: Dec 2013 to Jan 2014
2013Kalisindh TPP
Fly ash system
- System
- Single-stage dense phase pneumatic pressure conveying
- Capacity
- 210 TPH
- Conveying distance
- 800 m
Bottom ash system
- System
- Water-impounded bottom ash hopper, jet pumps and slurry pumps
- Capacity
- 3 × 60 TPH
- Owner
- Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
- Executed through
- Wonder Cement (fly ash); BGR Energy Systems (bottom ash)
- Commissioning
- Sep 2013
- Note
- Operation and maintenance by Macawber Beekay.
2013Kalisindh TPP
Fly ash system
- System
- Single-stage dense phase pneumatic pressure conveying
- Capacity
- 210 TPH
- Conveying distance
- 700 m
Bottom ash system
- System
- Water-impounded bottom ash hopper, jet pumps and slurry pumps
- Owner
- Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
- Executed through
- Ambuja Cement (fly ash); BGR Energy Systems (bottom ash)
- Commissioning
- Dec 2013
- Note
- Operation and maintenance by Macawber Beekay.
2013Ukai TPP
Fly ash system
- System
- Single-stage dense phase pneumatic pressure conveying
- Capacity
- 210 TPH
- Conveying distance
- 300 m
Bottom ash system
- System
- Submerged scraper chain conveyor, belt conveyor and disposal
- Capacity
- 2 × 45 TPH
- Owner
- Gujarat State Electricity Corporation Ltd.
- Executed through
- BHEL-ISG, Bengaluru
- Commissioning
- Bottom ash: Dec 2012Fly ash: Mar to Apr 2013
- Note
- Operation and maintenance by Macawber Beekay.
2012Mettur TPP
Fly ash system
- System
- Vacuum extraction (Stage I), then dense phase pressure conveying (Stage II)
- Capacity
- Stage I: 4 × 73.5 TPHStage II: 2 × 147 TPH
- Conveying distance
- Stage I: 80 mStage II: 900 m
Bottom ash system
- System
- Dry bottom ash conveyor (DRYCON)
- Capacity
- 45 TPH normal, 90 TPH design
Slurry disposal and HCSD
- System
- Lean slurry disposal
- Capacity
- 460 m³/h at 42 MWC
- Pumping distance
- 4,000 m
- Owner
- Tamil Nadu Electricity Board
- Executed through
- BGR Energy Systems, Chennai
- Commissioning
- Nov 2012 (COD Dec 2012)
2012Sikka TPP, Jamnagar
Fly ash system
- System
- Single-stage dense phase pneumatic pressure conveying, with slurry disposal
- Capacity
- 30.2 TPH per stream (4 streams)
- Conveying distance
- 900 m
Bottom ash system
- System
- Submerged scraper chain conveyor, belt conveyor and disposal
- Capacity
- 4 × 5 TPH
- Owner
- Gujarat State Electricity Corporation Ltd.
- Executed through
- BHEL-ISG, Bengaluru
- Commissioning
- Dec 2012
2012Korba East TPS
Fly ash system
- System
- Vacuum extraction by mechanical exhauster (Stage I), then dense phase pressure conveying (Stage II)
- Capacity
- Units 1 to 4: 50 TPHUnits 5 & 6: 60 TPH
- Conveying distance
- Stage I: 60 mStage II: 500 m
Bottom ash system
- System
- Dewatering bins with sedimentation and settling tanks; bottom ash and fly ash then go to HCSD
Slurry disposal and HCSD
- System
- High concentration slurry disposal (HCSD)
- Capacity
- 135 m³/h
- Pumping distance
- 9,500 m
- Owner
- Chhattisgarh State Power Generation Company Ltd.
- Commissioning
- Fly ash: May to Nov 2011HCSD: Sep 2012
2011Suratgarh TPS
Fly ash system
- System
- Dense phase pneumatic pressure conveying
- Capacity
- 100 TPH
- Conveying distance
- 200 m
- Owner
- Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
- Executed through
- Grasim Cement and Shree Cement
- Commissioning
- Jan 2011
2011Korba West TPS (renovation)
Fly ash system
- System
- Vacuum extraction by mechanical exhauster (Stage I), then dense phase pressure conveying (Stage II)
- Capacity
- Units 1 to 4: 50 TPHUnits 5 & 6: 60 TPH
- Conveying distance
- Stage I: 60 mStage II: 500 m
- Owner
- Chhattisgarh State Power Generation Company Ltd.
- Commissioning
- Units 1 & 2: May 2011Units 3 & 4: Aug and Nov 2011
2011Obra TPP
Fly ash system
- System
- Dense phase pneumatic pressure conveying
- Capacity
- Unit 9: 54 TPH
- Conveying distance
- 300 m
- Owner
- Uttar Pradesh Rajya Vidyut Utpadan Nigam Ltd.
- Executed through
- Jaiprakash Associates, Noida
- Commissioning
- Mar 2011
2011Sikka TPP
Fly ash system
- System
- Dense phase pneumatic pressure conveying
- Capacity
- Stage I: 2 × 20 TPHStage II: 2 × 35 TPH
- Conveying distance
- Stage I: 150 mStage II: 1,550 m
- Owner
- Gujarat State Electricity Corporation Ltd.
- Executed through
- Shree Digvijay Cement, Jamnagar
- Commissioning
- Jan 2011
2011Kothagudem TPS, Stations A, B & C
Fly ash system
- System
- Vacuum extraction by mechanical exhauster (Stage I), then dense phase pressure conveying (Stage II)
- Capacity
- Stage I: 42 TPH per unit (Units 1 to 4), 2 × 45 TPH per unit (Units 5 to 8)Stage II: 50 TPH per unit (Units 1 to 4), 100 TPH (Units 5 to 8)
- Conveying distance
- Stage I: 80 to 90 mStage II: 1,000 m (Units 1 to 4), 1,200 m (Units 5 to 8)
- Owner
- Andhra Pradesh Power Generation Corporation Ltd.
- Commissioning
- Units 1 to 4: Jun to Dec 2010Units 5 to 8: Jun to Oct 2011
2010Chhabra TPS
Fly ash system
- System
- Dry fly ash collection and transportation
- Capacity
- Stage I: 75 TPH per unitStage II: 112 TPH per unit
- Conveying distance
- 1,000 m
Bottom ash system
- System
- Scraper chain conveyor
- Capacity
- 36 TPH
- Owner
- Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
- Executed through
- Grasim Industries and Shree Cement (fly ash); Punj Lloyd (bottom ash)
- Commissioning
- Unit 1: Oct 2009Unit 2: May 2010
2010Suratgarh STPP
Fly ash system
- System
- Dense phase pneumatic pressure conveying
- Capacity
- 100 TPH
- Conveying distance
- 200 m
- Owner
- Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
- Executed through
- Shree Cement, Beawar
- Commissioning
- Jan 2010
2010Rayalaseema TPP, Stage III
Fly ash system
- System
- Vacuum extraction by mechanical exhauster (Stage I), then dense phase pressure conveying (Stage II)
- Capacity
- Stage I: 4 × 45 TPHStage II: 2 × 90 TPH
- Conveying distance
- Stage I: 75 mStage II: 1,200 m
Bottom ash system
- System
- Water-impounded bottom ash hopper, jet pumps and slurry pumps
- Capacity
- 2 × 65 TPH
Slurry disposal and HCSD
- System
- Lean slurry disposal
- Capacity
- 240 m³/h at 41 MWC
- Pumping distance
- 5,500 m
- Owner
- Andhra Pradesh Power Generation Corporation Ltd.
- Commissioning
- Nov 2010
2010Panipat TPS
Fly ash system
- System
- Vacuum extraction by mechanical exhauster (Stage I), then dense phase pressure conveying (Stage II)
- Capacity
- Stage I: 2 × 30 TPH per 110 MW unit, 4 × 30 TPH for the 210 MW unitStage II: 60 TPH per unit
- Conveying distance
- Stage I: 100 mStage II: 1,300 m
- Owner
- Haryana Power Generation Corporation Ltd.
- Executed through
- Jaiprakash Associates, Noida
- Commissioning
- Unit 5: Mar 2010Unit 4: May 2010Unit 3: Jul 2010
2009Giral Lignite TPP
Fly ash system
- System
- Dense phase pneumatic pressure conveying
- Capacity
- 65 TPH
- Conveying distance
- 760 m
Bottom ash system
- System
- Bed ash by scraper chain conveyor
- Capacity
- 20 TPH
- Owner
- Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
- Executed through
- Tata Power, Hyderabad
- Commissioning
- Jan 2009
2008Chandrapur TPS
Fly ash system
- System
- Dense phase pneumatic pressure conveying
- Capacity
- Stage I: 70 TPHStage II: 70 TPH
- Conveying distance
- Stage I: 250 mStage II: 700 m
- Owner
- Maharashtra State Electricity Board
- Executed through
- UltraTech Cement, Mumbai
- Commissioning
- Jun 2008
2008Guru Hargobind TPP, Lehra Mohabbat
Fly ash system
- System
- Dense phase pneumatic pressure conveying
- Capacity
- 2 × 120 TPH
- Conveying distance
- 320 m
Bottom ash system
- System
- Water-impounded bottom ash hopper, jet pumps and slurry pumps
- Capacity
- 2 × 60 TPH
Slurry disposal and HCSD
- System
- Lean slurry disposal
- Capacity
- 700 m³/h at 41 MWC
- Pumping distance
- 2 × 2,000 m
- Owner
- Punjab State Electricity Board
- Executed through
- BHEL-ISG, Bengaluru
- Commissioning
- Unit 3: Jan 2008Unit 4: Jul 2008
2008Mejia TPS (Boilers 1, 2 & 3)
Fly ash system
- System
- Dense phase pneumatic pressure conveying
- Capacity
- Stage I: 3 × 37.5 TPHStage II: 100 TPH
- Conveying distance
- 1,600 m
- Owner
- Damodar Valley Corporation
- Executed through
- Lafarge India, Kolkata
- Commissioning
- Jun 2008
2008Rayalaseema TPP, Stage II
Slurry disposal and HCSD
- System
- Ash slurry disposal (design, supply, erection and commissioning)
- Capacity
- 68 TPH per stream, 2 streams (80 m³/h)
- Pumping distance
- 15,000 m
- Owner
- Andhra Pradesh Power Generation Corporation Ltd.
- Commissioning
- Sep 2008
2008Giral Lignite TPP
Fly ash system
- System
- Dense phase pneumatic pressure conveying
- Capacity
- 65 TPH
- Conveying distance
- 600 m
Bottom ash system
- System
- Bed ash by drag chain conveyor
- Capacity
- 20 TPH
- Owner
- Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
- Commissioning
- May 2008
2007Kota TPS
Fly ash system
- System
- Dense phase pneumatic pressure conveying
- Capacity
- 80 TPH
- Conveying distance
- 1,250 m
- Owner
- Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
- Executed through
- Birla Corporation, Chanderia
- Commissioning
- May 2007
2007Rayalaseema TPP
Fly ash system
- System
- Dense phase pneumatic pressure conveying
- Capacity
- 90 TPH per stream
- Conveying distance
- 1,800 m
- Owner
- Andhra Pradesh Power Generation Corporation Ltd.
- Commissioning
- Jun 2007
2007Kota TPS
Fly ash system
- System
- Vacuum extraction by mechanical exhauster (Stage I), then dense phase pressure conveying (Stage II)
- Capacity
- Stage I: 2 × 30 TPHStage II: 50 TPH
- Conveying distance
- Stage I: 170 mStage II: 1,500 m
- Owner
- Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
- Executed through
- ACC, Mumbai
- Commissioning
- Apr 2007
2006Kota TPS
Fly ash system
- System
- Dense phase pneumatic pressure conveying
- Capacity
- Stage I: 80 TPHStage II: 100 TPH
- Conveying distance
- 750 m
- Owner
- Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
- Executed through
- Grasim Industries, Mumbai
- Commissioning
- Unit 5: Aug 2006Unit 4: Oct 2006
2005Chandrapur TPS
Fly ash system
- System
- Dense phase pneumatic pressure conveying
- Capacity
- 62 TPH
- Conveying distance
- about 900 m
- Owner
- Maharashtra State Electricity Board
- Executed through
- ACC (Chanda Cement Works)
- Commissioning
- Dec 2005
2005Bandel TPP
Fly ash system
- System
- Vacuum extraction by mechanical exhauster (Stage I), then dense phase pressure conveying (Stage II)
- Capacity
- 2 × 35 TPH and 2 × 50 TPH
- Conveying distance
- Stage I: 100 to 120 mStage II: 550 m
- Owner
- West Bengal Power Development Corporation Ltd.
- Commissioning
- Aug 2005
2003Mettur TPS
Fly ash system
- System
- Dense phase pneumatic pressure conveying
- Capacity
- 50 TPH
- Conveying distance
- 520 m
- Owner
- Tamil Nadu Electricity Board
- Executed through
- ACC, Mumbai
- Commissioning
- Feb 2003
2003Mettur TPS
Fly ash system
- System
- Dense phase pneumatic pressure conveying
- Capacity
- 80 TPH
- Conveying distance
- 525 m
- Owner
- Tamil Nadu Electricity Board
- Executed through
- Grasim Cement, Mumbai
- Commissioning
- Oct 2003
2003Mettur TPS
Fly ash system
- System
- Dense phase pneumatic pressure conveying
- Capacity
- 60 TPH
- Conveying distance
- 350 m
- Owner
- Tamil Nadu Electricity Board
- Executed through
- Chettinad Cement, Tamil Nadu
- Commissioning
- Dec 2003
2001Khaperkheda TPS
Bottom ash system
- System
- Water-impounded bottom ash hopper and jet pumps
- Capacity
- 4 × 60 TPH (2 working, 2 standby)
- Owner
- Maharashtra State Electricity Board
- Commissioning
- May 2000 to Jan 2001
1999Raichur TPS
Fly ash system
- System
- Vacuum extraction by mechanical exhauster (Stage I), then dense phase pressure conveying (Stage II)
- Capacity
- Stage I: 3 × 30 TPHStage II: 70 TPH
- Conveying distance
- Stage I: 85 mStage II: 950 m
- Owner
- Karnataka Power Corporation Ltd.
- Executed through
- ACC (P&E Division), Thane
- Commissioning
- Aug 1999
—Suratgarh Super Critical TPP
Fly ash system
- System
- Two-stage dense phase pneumatic pressure conveying
- Capacity
- Stage I: 260 TPHStage II: 2 × 130 TPH
- Conveying distance
- Stage I: 550 mStage II: about 1,200 m
Bottom ash system
- System
- Water-impounded bottom ash hopper, jet pumps and slurry pumps
- Capacity
- 2 × 120 TPH
Slurry disposal and HCSD
- System
- Lean slurry disposal
- Capacity
- 965 m³/h at 46 MWC
- Pumping distance
- 4 × 4,000 m
- Owner
- Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
- Executed through
- BHEL-ISG, Bengaluru
- Commissioning
- Commissioned
—New Neyveli Lignite TPP
Fly ash system
- System
- Vacuum extraction (Stage I), then dense phase pressure conveying (Stage II)
- Capacity
- Stage I: 86 TPH, ESP to buffer hopperStage II: 86 TPH, buffer hopper to main silo
- Conveying distance
- Stage I: 150 mStage II: 1,000 m
Bottom ash system
- System
- Water-impounded hopper with submerged scraper chain conveyor and belt conveyor
- Capacity
- 97 TPH wet; belt conveyor 45 TPH
Slurry disposal and HCSD
- System
- Lean slurry disposal
- Capacity
- 1,250 m³/h at 40 MWC
- Pumping distance
- 3,000 m
- Owner
- Neyveli Lignite Corporation Ltd.
- Executed through
- Essar Projects India, Mumbai
- Commissioning
- Commissioned
—Barauni TPP
Fly ash system
- System
- Vacuum extraction by mechanical exhauster (Stage I), then dense phase pressure conveying (Stage II)
- Capacity
- Stage I: 4 × 66 TPHStage II: 2 × 132 TPH
- Conveying distance
- Stage I: 150 mStage II: 550 m
Bottom ash system
- System
- Water-impounded bottom ash hopper, jet pumps and slurry pumps
- Capacity
- 2 × 60 TPH
Slurry disposal and HCSD
- System
- Lean slurry disposal
- Capacity
- 630 m³/h at 38 MWC
- Pumping distance
- 6,000 m
- Owner
- Bihar State Electricity Board
- Executed through
- BHEL-ISG, Bengaluru
- Commissioning
- Commissioned
How to read the list
Each row is one project: the year it was commissioned (or "In progress"), the power station, the owner, the unit configuration and the state. The tags show which systems Macawber Beekay supplied. Open a row for the specification of each system and the commissioning dates by unit.
- Fly ash system: how dry fly ash is moved from the ESP, air pre-heater and economiser hoppers to the silos, with the conveying capacity and distance. See fly ash handling.
- Bottom ash system: how coarse ash is removed from below the boiler, with its capacity. See bottom ash handling.
- Slurry disposal and HCSD: how ash is pumped to the ash dyke or a mine, as lean slurry or as high concentration slurry, with the pumping capacity and pipeline length. See ash slurry disposal.
- Executed through: where the order came through an EPC contractor or a cement company, it is named here.
Terms used in the specifications
| Term | Meaning |
|---|---|
| TPH | Tonnes per hour: conveying capacity for dry ash |
| m³/h | Cubic metres per hour: pumping capacity for slurry |
| MWC | Metres of water column: the pump's delivery head |
| Stage I / Stage II | Two-stage fly ash systems: Stage I collects ash from the hoppers to a buffer or intermediate silo, Stage II conveys it to the main silos |
| Working / standby | How many streams or pumps run at once, and how many are kept in reserve |
| HCSD | High concentration slurry disposal: ash pumped at high solids content, using much less water |
| AWRS | Ash water recovery system: recovers ash water from the ash dyke or pond |
| BAOF | Bottom ash overflow: slurry from the bottom ash system, pumped to the ash dyke or dewatering bins |
| Static head | The height difference the slurry pipeline has to lift through |
| COD | Commercial operation date |
What the list shows
- Unit sizes from 50 MW to 800 MW. The earliest project, Raichur TPS for KPCL, was commissioned in August 1999. Recent orders are mostly for 660 MW and 800 MW units.
- Fly ash conveying up to 1,800 m (Rayalaseema TPP for APGENCO), and two-stage systems with Stage I carrying up to 363 TPH (Telangana STPP for NTPC).
- Slurry pipelines up to 16,000 m (Yermarus Thermal Power Station, Raichur), and HCSD pipelines of 12,000 m at Bhusawal and Korba West, with 13,000 m under design for Korba West 2 × 660 MW.
- Ash disposal to mine voids at NTPC Talcher Stage II, with ash water recovery.
Further reading
Last reviewed
Talk to our engineers
Our team in Noida answers enquiries on every system we build.
Get in touch+91 120 450 7700Questions buyers ask
Which NTPC power stations has Macawber Beekay built ash handling systems for?
Commissioned NTPC references include Mouda (2 × 500 MW), Vindhyachal Stage V (1 × 500 MW), the Sipat Stage I dry fly ash augmentation (3 × 660 MW), Rihand Stage III (2 × 500 MW), Telangana STPP (2 × 800 MW) and North Karanpura (3 × 660 MW), plus NSPCL (NTPC-SAIL Power Company) at Rourkela and the Maitree project of BIFPCL in Bangladesh. Lara Stage II, Talcher and Rihand Stage I are under execution.
Which state power utilities are on Macawber Beekay's reference list?
State references include RRVUNL (Rajasthan), MAHAGENCO and the former MSEB (Maharashtra), GSECL (Gujarat), CSPGCL (Chhattisgarh), APGENCO and APPDCL (Andhra Pradesh), TNEB and TANGEDCO (Tamil Nadu), UPRVUNL (Uttar Pradesh), HPGCL (Haryana), WBPDCL (West Bengal), KPCL and Raichur Power Corporation (Karnataka), Bihar State Electricity Board, PSEB (Punjab) and SCCL (Telangana).
Has Macawber Beekay supplied high concentration slurry disposal (HCSD) systems?
Yes. Fifteen projects on the list include HCSD, among them Korba West and Korba East for CSPGCL, NTPC Mouda, Telangana STPP and North Karanpura, Wanakbori for GSECL, Bhusawal for MAHAGENCO and NSPCL Rourkela. HCSD pipelines on the list run up to 12,000 m, at Bhusawal and Korba West, and 13,000 m at Korba West 2 × 660 MW, now under design.
What unit sizes do these ash handling references cover?
The list runs from 50 MW units at Korba East to 800 MW units at Yermarus, Wanakbori, Krishnapatnam, Telangana STPP and Lara. Recent orders are mostly for 660 MW and 800 MW units, and the earliest project listed, Raichur TPS for KPCL, was commissioned in August 1999.
Explore related systems.
Fly ash handlingFly ash handling systems that convey dry fly ash from ESP, APH and economiser hoppers to silos by dense phase pressure or vacuum conveying, with Dome Valves.
Bottom ash handlingBottom ash handling systems for PF and CFBC boilers: jet pump, submerged scraper chain conveyor (SSCC), dry and dense phase systems by Macawber Beekay.
Ash slurry disposalAsh slurry disposal systems: lean slurry with ash water recovery, and high concentration slurry disposal (HCSD) at about 60% concentration, up to 17 km.
ClientsClients of Macawber Beekay across power utilities, EPC contractors, metals and cement, including NTPC, BHEL, Tata Power, Adani, Vedanta and ACC.
Talk to our engineers.
Planning a new plant or upgrading one? Our engineering team in Noida is ready to help.